The E Howard Street / Chestnut Street intersection remains the sole intersection necessitating upgrades according to the Comprehensive Plan. Situated at the confluence of two minor arterials, Chestnut Street is currently stop-controlled, with a 50-ft offset in the through movement. These geometric and intersection control constraints have resulted in an existing Level of Service (LOS) of E, and a projected LOS of F by the year 2040.
Projects — TIB Project Information
TIB Project Information
City of Walla Walla's E Chestnut Street Roundabout
8-4-176(028)-1
8-4-176(028)-1
E Chestnut Street Roundabout
Approximately 200ft north south east and west
FY 2025 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $1,110,000
County: Walla Walla | Legislative District: 16 | Project Length: 0.10 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/19/2024
Project Information
Lead Agency | WALLA WALLA |
Funding Year | 2025 |
Program | UAP |
Current Phase | Design |
Legislative District | 16 |
Congressional District | 5 |
Federal Route Number | 7178 |
Project Length | 0.10 mi. |
ADT | 9,620 |
Functional Class | Minor |
Type of Work | Traffic Control |
Project Contact | Mike Laughery |
Contact Email | mlaughery@wallawallawa.gov |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 11/19/2024 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2028 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2024 | 02/02/2024 |
Bid Auth. Approval | 12/03/2024 | |
Construction Approval | 01/29/2025 | |
Project Closeout | 12/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 191,126 | 260,000 |
Right of Way | 73,510 | 100,000 |
Total Design | 264,636 | 360,000 |
Construction Engineering | 110,265 | 150,000 |
Construction Contract | 735,099 | 1,000,000 |
Other Construction | 0 | 0 |
Total Construction | 845,364 | 1,150,000 |
Total TIB Funding | 1,110,000 | 1,510,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WALLA WALLA | 400,000 | 26.5% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 400,000 | 26.5% |
Project Description
The implementation of a roundabout is projected to elevate the Level of Service (LOS) from E to A on opening day and maintain this improved LOS throughout the 2040 design year. The proposed roundabout will be incorporated into the Citys forthcoming Infrastructure Repair and Replacement Program (IRRP) project. The Howard Street IRRP project will replace all water, sewer, and roadway infrastructure between Juniper Street and Bryant Street along Howard Street.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |