School Street and W Pine Street see heavy bus traffic. The existing road way is experiencing failures in multiple areas and is generally in a deteriorated state. Currently, school staff parks along School St., immediately south of its intersection with U.S. 12. This results in conflicts between vehicles turning onto School St. and parked vehicles. Existing curb ramps and sidewalk along W Pine Street are out of ADA compliance.
Projects — TIB Project Information
TIB Project Information
City of Oakville's School Street and W Pine Street
6-W-958(001)-1
6-W-958(001)-1
School Street and W Pine Street
SR 12 to Ash St and SR 12 to School St
FY 2024 Small City Arterial Program
Current Phase : Design
Total TIB Funding : $638,743
County: Grays Harbor | Legislative District: 19 | Project Length: 0.24 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | OAKVILLE |
Funding Year | 2024 |
Program | SCAP |
Current Phase | Design |
Legislative District | 19 |
Congressional District | 6 |
Federal Route Number | 9999 |
Project Length | 0.24 mi. |
ADT | 350 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Devin Jackson |
Contact Email | devin@jacksoncivil.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/28/2023 | 02/09/2023 |
Bid Auth. Approval | 04/30/2025 | |
Construction Approval | 06/15/2025 | |
Project Closeout | 10/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 100,000 | 100,000 |
Right of Way | 0 | 0 |
Total Design | 100,000 | 100,000 |
Construction Engineering | 45,000 | 45,000 |
Construction Contract | 493,743 | 493,743 |
Other Construction | 0 | 0 |
Total Construction | 538,743 | 538,743 |
Total TIB Funding | 638,743 | 638,743 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
OAKVILLE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Reconstruct the existing roadway by Full Depth Reclamation with a 6-inch cement treated base, surfaced with 3-inches of HMA. The project will also construct/improve existing pedestrian infrastructure inclusion of Rectangular Rapid Flashing Beacons (RRFB) for street crossings. The RRFBs are proposed at the intersection of School Street and W. Pine St. and at the intersection of Park St., W. Pine St., and US 12.To limit access from U.S. 12, W. Pine Street is proposed to be a one way street, with angled parking.
Existing Condition
Project Benefits
- Restores structural condition;
- Removes ADA barriers;
- Incorporates recycled materials
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |