The project is needed to provide sustainable, efficient, and safe travel for people who use the Washington Boulevard corridor. The Washington and Manette Bridge intersection is signalized and currently operates at a Level of Service (LOS) E with 740 foot queues. The project segment from Pacific Avenue to the Manette Bridge does not provide safe, ADA accessible bicycle and pedestrian infrastructure that supports the City's plans for improving active transportation modes of travel. Some areas along the existing northeast side of the corridor include only a 2 foot wide sidwalk that doesn't provide ADA accessibility. There is a need to improve the long term functionality of the Washington Boulevard/Mannette Bridge intersection and a need to provide safe, ADA accessible, connected pedestrian pathways.
Projects — TIB Project Information
TIB Project Information
City of Bremerton's Washington Avenue / 11th Street
8-2-152(028)-1
8-2-152(028)-1
Washington Avenue / 11th Street
Pacific Ave to Manette Bridge
FY 2023 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $1,742,143
County: Kitsap | Legislative District: 23 | Project Length: 0.27 | TIB Engineer: Chris Langhoff | Last Payment Date: 11/22/2024
Project Information
Lead Agency | BREMERTON |
Funding Year | 2023 |
Program | UAP |
Current Phase | Construction |
Legislative District | 23 |
Congressional District | 6 |
Federal Route Number | 6589 |
Project Length | 0.27 mi. |
ADT | 8,200 |
Functional Class | Principal |
Type of Work | Reconstruction |
Project Contact | Shane Weber |
Contact Email | shane.weber@ci.bremerton.wa.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | 11/22/2024 |
Cultural Resource Assessment | Section 106 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 01/01/2023 | |
DAHP Assessment Date | 04/27/2023 | |
Predesign Approval | ||
Design Approval | 02/28/2022 | 02/24/2022 |
Bid Auth. Approval | 05/01/2023 | 04/27/2023 |
Construction Approval | 07/30/2023 | 07/24/2023 |
Project Closeout | 06/30/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 265,751 | 940,562 |
Construction Contract | 1,476,392 | 6,320,088 |
Other Construction | 0 | 0 |
Total Construction | 1,742,143 | 7,260,650 |
Total TIB Funding | 1,742,143 | 7,260,650 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
BREMERTON | 1,863,881 | 25.7% |
WSDOT Funding | 0 | 0.0% |
Federal STP | 3,654,626 | 50.3% |
Total Local Funding | 5,518,507 | 76.0% |
Project Description
The project will replace the signalized intersection of Washington Avenue and Manette Bridge with a roundabout. The project will reconstruct Washington/11th from Pacific Avenue to Manette Bridge and provide ADA accessible sidewalks, bike lanes, lighting, stormwater improvements, and other traffic calming design features.
Existing Condition
Project Benefits
- Benefits of the project include a sustainable transportation solution at the intersection of Washington Boulevard/Mannette Bridge that improves operations and safety for all modes of travel. It will improve connectivity for people walking and biking to the neighborhoods, parks, and downtown area that is consistent with the City's goal to improve walking and cylcing as well as health and wellness. The only impacts to the community will occur during construction.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |