West Maple Street is a residential street adjacent to McCleary's commercial and central business district, directly to the south. In addition to the single family residences on this street, a memory care and assisted living facility with approximately 75 residents is situated at the end of the planned sidewalk improvement, at S 6th and W Maple. The pedestrians walking between 6th and 5th street are forced to walk in the street on West Maple St, as there is no sidewalk on this block. The existing sidewalk between S 5th St and S Main St is noncontiguous, is cracked in multiple locations and does not include ADA compliant ramps. In addition, water ponds on the sidewalk in multiple locations along the project alignment.
Projects — TIB Project Information
TIB Project Information
City of McCleary's W Maple Street Sidewalk
P-W-956(P07)-1
P-W-956(P07)-1
W Maple Street Sidewalk
S 6th St to S Main St
FY 2025 Active Transportation Program
Current Phase : Design
Total TIB Funding : $495,843
County: Grays Harbor | Legislative District: 19 | Project Length: 1,080.00 | TIB Engineer: Chris Langhoff | Last Payment Date: 09/18/2024
Project Information
Lead Agency | MCCLEARY |
Funding Year | 2025 |
Program | ATP |
Current Phase | Design |
Legislative District | 19 |
Congressional District | 6 |
Federal Route Number | 9999 |
Project Length | 1080.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Chad Bedlington |
Contact Email | chadb@cityofmccleary.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | 09/18/2024 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 12/15/2023 | 12/18/2023 |
Bid Auth. Approval | 03/15/2025 | |
Construction Approval | 04/15/2025 | |
Project Closeout | 12/15/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 57,209 | 60,220 |
Right of Way | 0 | 0 |
Total Design | 57,209 | 60,220 |
Construction Engineering | 57,209 | 60,220 |
Construction Contract | 381,425 | 401,500 |
Other Construction | 0 | 0 |
Total Construction | 438,634 | 461,720 |
Total TIB Funding | 495,843 | 521,940 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MCCLEARY | 26,097 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 26,097 | 5.0% |
Project Description
This project will install a sidewalk with ADA compliant ramps along West Maple St.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |