City of Omak's Central Ave Reconstruction Phase II

6-E-987(008)-1

6-E-987(008)-1
Central Ave Reconstruction Phase II

Cedar St to Fir St

FY 2025 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $957,990

County: Okanogan   |   Legislative District: 7   |   Project Length: 0.16   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 03/05/2025

Project Information

Lead Agency OMAK
Funding Year 2025
Program SCAP
Current Phase Construction
Legislative District 7
Congressional District 4
Federal Route Number 9999
Project Length 0.16 mi.
ADT 750
Functional Class TIB Arterial
Type of Work Reconstruction
Project Contact Wayne Beetchenow
Contact Email publicworks@omakcity.com
TIB Engineer Andrew Beagle
Last Payment Date 03/05/2025
Cultural Resource Assessment IDP

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2026  
DAHP Assessment Date   01/31/2025
Predesign Approval
Design Approval 02/15/2024 02/06/2024
Bid Auth. Approval 05/15/2025 04/25/2025
Construction Approval 05/21/2025 05/30/2025
Project Closeout 12/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 108,490 106,200
Right of Way 0 0
Total Design 108,490 106,200
     
Construction Engineering 108,490 122,200
Construction Contract 723,425 781,010
Other Construction 0 0
Total Construction 831,915 903,210
     
Funding Increase 17,585  
Total TIB Funding 957,990 1,009,410

Local Funding Partners

Funding Amount Percent
OMAK 51,420 5.1%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 51,420 5.1%

Project Description

Pulverize, regrading, Cement Treated Base (CTB) and pave roadway. Construct two 10 foot wide travel lanes, blubouts, ADA ramps, sidewalk infill and replacement, replacement or new storm drain as needed.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.