Current Phase : Design
Total TIB Funding : $657,900
County: Walla Walla | Legislative District: 16 | Project Length: 1,970.00 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
Lead Agency | COLLEGE PLACE |
Funding Year | 2025 |
Program | ATP |
Current Phase | Design |
Legislative District | 16 |
Congressional District | 5 |
Federal Route Number | 7212 |
Project Length | 1970.00 mi. |
ADT | 0 |
Functional Class | Minor |
Type of Work | Pedestrian |
Project Contact | Mike Rizzitiello |
Contact Email | mrizzitiello@cpwa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/27/2024 | 12/19/2023 |
Bid Auth. Approval | 04/12/2025 | |
Construction Approval | 05/11/2025 | |
Project Closeout | 06/10/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 75,600 | 84,000 |
Right of Way | 0 | 0 |
Total Design | 75,600 | 84,000 |
Construction Engineering | 75,600 | 84,000 |
Construction Contract | 506,700 | 563,000 |
Other Construction | 0 | 0 |
Total Construction | 582,300 | 647,000 |
Total TIB Funding | 657,900 | 731,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
COLLEGE PLACE | 73,100 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 73,100 | 10.0% |
Project Description
This project will provide continuous sidewalk from SE Birch Ave to SE Larch Ave., on the south side, by filling the gaps west of SE Vintage Way and the gap to the east mid-block between SE Whispering Creek Ct and SE Larch Ave. The project will provide ADA ramps and reconstruction an existing substandard ramp.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |