Main Avenue West is a collector street that extends from the Central Business District to the residential neighborhoods on the west side of the City. The street has been a priority for repair for many years. In 2008, the City overlayed and reconstructed sidewalks from Division to Cherry. At that time, the utilities were determined to be in very poor condition. The City has recently replaced water and sewer mains from Cherry St to the west. The roadway has poor pavement and sidewalks with extensive spalling and alligator cracking. The roadway is also very wide.
Projects — TIB Project Information
TIB Project Information
City of Soap Lake's Main Avenue W
6-E-865(007)-1
6-E-865(007)-1
Main Avenue W
Cherry St S to Ginkgo St S
FY 2024 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $839,783
County: Grant | Legislative District: 12 | Project Length: 0.21 | TIB Engineer: Andrew Beagle | Last Payment Date: 08/30/2024
Project Information
Lead Agency | SOAP LAKE |
Funding Year | 2024 |
Program | SCAP |
Current Phase | Construction |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.21 mi. |
ADT | 750 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Darrin Fronsman |
Contact Email | Darrinf@soaplakewa.gov |
TIB Engineer | Andrew Beagle |
Last Payment Date | 08/30/2024 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 02/08/2023 |
Bid Auth. Approval | 02/28/2024 | 04/23/2024 |
Construction Approval | 05/15/2024 | 05/22/2024 |
Project Closeout | 10/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 132,500 | 115,000 |
Right of Way | 0 | 0 |
Total Design | 132,500 | 115,000 |
Construction Engineering | 132,500 | 78,639 |
Construction Contract | 885,000 | 646,144 |
Other Construction | 0 | 0 |
Total Construction | 1,017,500 | 724,783 |
Funding Surplus | - 310,217 | |
Total TIB Funding | 839,783 | 839,783 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SOAP LAKE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
CTB pavement reconstruction, remove damaged sidewalks, reconstruct sidewalk on one side. Narrow lane widths and add stormwater facilities.
Existing Condition
Project Benefits
- Extends improvements;
- Restores structural condition;
- Removes ADA barriers;
- Incorporates recycled materials
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |