City of Rock Island's Douglas Street Improvements

6-E-853(I02)-1

6-E-853(I02)-1
Douglas Street Improvements

Rock Island Rd to 3rd St SW

FY 2025 Small City Arterial Program
Current Phase : Design
Total TIB Funding : $106,850

County: Douglas   |   Legislative District: 7   |   Project Length: 0.32   |   TIB Engineer: Andrew Beagle   |   Last Payment Date:

Project Information

Lead Agency ROCK ISLAND
Funding Year 2025
Program SCAP
Current Phase Design
Legislative District 7
Congressional District 4
Federal Route Number 5943
Project Length 0.32 mi.
ADT 0
Functional Class Collector
Type of Work Reconstruction
Project Contact Charity Duffy
Contact Email Edc@rockislandwa.gov
TIB Engineer Andrew Beagle
Last Payment Date
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2026  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2024 02/19/2024
Bid Auth. Approval 11/01/2024
Construction Approval 12/30/2024
Project Closeout 12/30/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 11,894 100,000
Right of Way 0 0
Total Design 11,894 100,000
     
Construction Engineering 6,542 55,000
Construction Contract 88,414 743,350
Other Construction 0 0
Total Construction 94,956 798,350
     
Total TIB Funding 106,850 898,350

Local Funding Partners

Funding Amount Percent
ROCK ISLAND 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
Federal Funding  791,500 88.1%
Total Local Funding 791,500 88.1%

Project Description

Full depth reclamation and paving. Add 5' sidewalk on oneside, two 6' bike lanes, two 12' travel lanes, and storm water facilities.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments