TIB Project Information

Town of Farmington's 2025 Otta Seal

2-E-910(003)-1

2-E-910(003)-1
2025 Otta Seal

Multiple Locations

FY 2026 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $200,000

County: Whitman   |   Legislative District: 9   |   Project Length: 1.00   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency FARMINGTON
Funding Year 2026
Program SCPP
Current Phase Design
Legislative District 9
Congressional District 5
Federal Route Number 9999
Project Length 1.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Beth Anderson
Contact Email townoffarmington.wa@gmail.com
TIB Engineer Jonathan Heusman
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   09/27/2024
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 11/01/2024 11/01/2024
Bid Auth. Approval 03/01/2025
Construction Approval 04/01/2025
Project Closeout 10/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 200,000 200,000
Other Construction 0 0
Total Construction 200,000 200,000
     
Total TIB Funding 200,000 200,000

Local Funding Partners

Funding Amount Percent
FARMINGTON 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Double Otta Seal on Whitman St

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments