Many streets throughout the Town are in need of crack sealing and some pavement repair to protect against deterioration
Projects — TIB Project Information
TIB Project Information
Town of Endicott's 2024 Street Maintenance
2-E-909(003)-1
2-E-909(003)-1
2024 Street Maintenance
Multiple Locations
FY 2025 Small City Preservation Program
Current Phase : Construction
Total TIB Funding : $21,206
County: Whitman | Legislative District: 9 | Project Length: 0.00 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
Lead Agency | ENDICOTT |
Funding Year | 2025 |
Program | SCPP |
Current Phase | Construction |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Kim Zolman |
Contact Email | townofendicott@gmail.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2024 | 02/14/2024 |
Bid Auth. Approval | 06/30/2024 | 02/14/2024 |
Construction Approval | 06/30/2024 | 07/29/2024 |
Project Closeout | 12/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 31,690 | 21,206 |
Other Construction | 0 | 0 |
Total Construction | 31,690 | 21,206 |
Funding Surplus | - 10,484 | |
Total TIB Funding | 21,206 | 21,206 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
ENDICOTT | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Crack Seal street cracks, 1/4 or wider. Mastic Repair for wide cracks. Will be a city wide crack seal without pavement repair.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |