Spokane Way serves as the shortest route from the Towns of Hartline and Almira to Grand Coulee. The existing roadway has excessive steep banks, cross slopes, horizontal curves and pavement condition.
Projects — TIB Project Information
TIB Project Information
City of Grand Coulee's Spokane Way Improvements
6-E-859(004)-1
6-E-859(004)-1
Spokane Way Improvements
Alcan Rd to E Grand Coulee Ave (SR 174)
FY 2025 Small City Arterial Program
Current Phase : Design
Total TIB Funding : $126,876
County: Grant | Legislative District: 7 | Project Length: 0.19 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | GRAND COULEE |
Funding Year | 2025 |
Program | SCAP |
Current Phase | Design |
Legislative District | 7 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.19 mi. |
ADT | 750 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Lorna Pearce |
Contact Email | clerkgc@gccitywa.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | |
Cultural Resource Assessment | Section 106 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 04/01/2024 | 01/08/2024 |
Bid Auth. Approval | 12/31/2025 | |
Construction Approval | 02/28/2026 | |
Project Closeout | 12/31/2026 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 13,913 | 111,300 |
Right of Way | 6,250 | 50,000 |
Total Design | 20,163 | 161,300 |
Construction Engineering | 13,913 | 111,300 |
Construction Contract | 92,800 | 742,400 |
Other Construction | 0 | 0 |
Total Construction | 106,713 | 853,700 |
Total TIB Funding | 126,876 | 1,015,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
GRAND COULEE | 10,149 | 1.0% |
WSDOT Funding | 0 | 0.0% |
STBG | 877,975 | 86.5% |
Total Local Funding | 888,124 | 87.5% |
Project Description
Reconstruct the roadway and realign. Cement treated base will likely be used and stormwater will be collected and conveyed to the existing system.