West E Street connects the Forks Community Hospital - a vital public facility and tourist destination - to the Forks Transit Center. Currently, no pedestrian infrastructure exists on West E Street and the road itself is in poor condition. Without pedestrian facilities, West E Street, and the hospital itself cannot be truly accessible to the community. Additionally, the current road condition presents a challenge to civilian and emergency vehicles accessing the hospital.
Projects — TIB Project Information
TIB Project Information
City of Forks's West E Street
6-W-825(009)-1
6-W-825(009)-1
West E Street
5th Ave to S Forks Ave (SR 101)
FY 2025 Small City Arterial Program
Current Phase : Design
Total TIB Funding : $549,613
County: Clallam | Legislative District: 24 | Project Length: 0.28 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | FORKS |
Funding Year | 2025 |
Program | SCAP |
Current Phase | Design |
Legislative District | 24 |
Congressional District | 6 |
Federal Route Number | 9999 |
Project Length | 0.28 mi. |
ADT | 7,400 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Devin Jackson |
Contact Email | devin@jacksoncivil.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 03/01/2024 | 12/12/2023 |
Bid Auth. Approval | 04/01/2025 | |
Construction Approval | 05/01/2025 | |
Project Closeout | 12/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 66,500 | 70,000 |
Right of Way | 0 | 0 |
Total Design | 66,500 | 70,000 |
Construction Engineering | 59,850 | 63,000 |
Construction Contract | 423,263 | 445,540 |
Other Construction | 0 | 0 |
Total Construction | 483,113 | 508,540 |
Total TIB Funding | 549,613 | 578,540 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
FORKS | 28,927 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 28,927 | 5.0% |
Project Description
A full depth reclamation would restore the structural integrity of the roadway and provide a smooth, even driving surface. An asphalt sidewalk is proposed along the North side for West E Street to provide pedestrian connectivity to public facilities.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |