The existing narrow and decaying sidewalks on Kansas Street Southwest put pedestrians at risk. A reconstruction that includes widening and improving the sidewalks. As the second busiest thoroughfare next to SR 162/Washington Avenue, Kansas Street SW is a primary route for log and gravel trucks. The current state of deteriorating pavement and poor subgrade material is unable to support the heavy traffic flow.The existing lighting on Kansas Street SW has been found non-conforming to local agency standards.
Projects — TIB Project Information
TIB Project Information
City of Orting's Kansas Street Reconstruction
8-1-813(004)-1
8-1-813(004)-1
Kansas Street Reconstruction
SR 162 to Coe Ln
FY 2025 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $4,420,363
County: Pierce | Legislative District: 2 | Project Length: 0.49 | TIB Engineer: Greg Armstrong | Last Payment Date: 11/26/2024
Project Information
Lead Agency | ORTING |
Funding Year | 2025 |
Program | UAP |
Current Phase | Design |
Legislative District | 2 |
Congressional District | 8 |
Federal Route Number | 3284 |
Project Length | 0.49 mi. |
ADT | 7,000 |
Functional Class | Collector |
Type of Work | Reconstruction |
Project Contact | Ryan McBee |
Contact Email | RMcBee@cityoforting.org |
TIB Engineer | Greg Armstrong |
Last Payment Date | 11/26/2024 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2028 | |
DAHP Assessment Date | 06/29/2023 | |
Predesign Approval | ||
Design Approval | 02/01/2024 | 12/06/2023 |
Bid Auth. Approval | 02/15/2025 | |
Construction Approval | 03/15/2025 | |
Project Closeout | 12/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 180,000 | 200,000 |
Total Design | 180,000 | 200,000 |
Construction Engineering | 315,000 | 350,000 |
Construction Contract | 3,925,363 | 4,361,515 |
Other Construction | 0 | 0 |
Total Construction | 4,240,363 | 4,711,515 |
Total TIB Funding | 4,420,363 | 4,911,515 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
ORTING | 491,152 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 491,152 | 10.0% |
Project Description
This project reconstructs Kansas Street Southwest restores structural condtion, adds new sidewalks, drainage improvements and adds lighting
Existing Condition
Project Benefits
- Restores structural condition;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |