21st St NE is an Urban Major Collector, situated between Eastmont Ave (Urban Minor Arterial) to the east and N Baker Ave (Urban Major Collector) to the west. Sidewalks are intermittent, traffic lanes have variable widths and stormwater facilities are substandard or missing throughout the corridor.
Projects — TIB Project Information
TIB Project Information
Douglas County's 21st St NE
8-3-009(012)-1
8-3-009(012)-1
21st St NE
N Baker Ave to N Devon Ave
FY 2025 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $1,518,791
County: Douglas | Legislative District: 12 | Project Length: 0.26 | TIB Engineer: Andrew Beagle | Last Payment Date: 10/30/2024
Project Information
Lead Agency | DOUGLAS COUNTY |
Funding Year | 2025 |
Program | UAP |
Current Phase | Design |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 5911 |
Project Length | 0.26 mi. |
ADT | 672 |
Functional Class | Collector |
Type of Work | Minor Widening |
Project Contact | Justin Roozen |
Contact Email | jroozen@co.douglas.wa.us |
TIB Engineer | Andrew Beagle |
Last Payment Date | 10/30/2024 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2028 | |
DAHP Assessment Date | 10/15/2024 | |
Predesign Approval | ||
Design Approval | 01/01/2024 | 12/18/2023 |
Bid Auth. Approval | 01/01/2026 | |
Construction Approval | 04/01/2026 | |
Project Closeout | 11/01/2026 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 178,108 | 209,539 |
Right of Way | 103,910 | 122,247 |
Total Design | 282,018 | 331,786 |
Construction Engineering | 132,512 | 155,896 |
Construction Contract | 1,104,261 | 1,299,131 |
Other Construction | 0 | 0 |
Total Construction | 1,236,773 | 1,455,027 |
Total TIB Funding | 1,518,791 | 1,786,813 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
DOUGLAS COUNTY | 268,022 | 15.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 268,022 | 15.0% |
Project Description
Construct two 11-foot traffic lanes, uphill bike lane, a shared downhill bike lane, 3-foot wide shoulders, and sidewalk along the eastbound lane. Curve radii improvements at N Baker Ave, Blackstone Ct, and N Devon Ave. Install illumination along the corridor. A rebuild of the canal crossing will be completed prior to the construction phase of this project.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |