Thers is a 2050 ft of missing gap in facilities along SR 516. Tahoma High School is located immediate south of project, pedestrian access to school campus and athletic events complex is within project limit. The school and other community destinations have generated great amount of non-motorized users along this stretch of SR 516. Pedestrian access is currently consist of 3-5 ft paved shoulder with limited sight distance on a 40 mph state highway carrying heavy traffic and truck volumes.
Projects — TIB Project Information
TIB Project Information
City of Maple Valley's SE Kent Kangley Road (SR 516) Sidewalk
P-P-205(P01)-1
P-P-205(P01)-1
SE Kent Kangley Road (SR 516) Sidewalk
800 ft east of 228th Ave SE to 250 ft west of 236th Pl SE
FY 2025 Active Transportation Program
Current Phase : Design
Total TIB Funding : $742,383
County: King | Legislative District: 5 | Project Length: 2,050.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | MAPLE VALLEY |
Funding Year | 2025 |
Program | ATP |
Current Phase | Design |
Legislative District | 5 |
Congressional District | 8 |
Federal Route Number | 0516 |
Project Length | 2050.00 mi. |
ADT | 17,760 |
Functional Class | Minor |
Type of Work | Pedestrian |
Project Contact | Amy Shaw |
Contact Email | Amy.Shaw@maplevalleywa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/12/2024 | 01/16/2024 |
Bid Auth. Approval | 03/31/2025 | |
Construction Approval | 05/27/2025 | |
Project Closeout | 06/30/2026 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 85,660 | 107,075 |
Right of Way | 0 | 0 |
Total Design | 85,660 | 107,075 |
Construction Engineering | 85,660 | 107,075 |
Construction Contract | 571,063 | 713,830 |
Other Construction | 0 | 0 |
Total Construction | 656,723 | 820,905 |
Total TIB Funding | 742,383 | 927,980 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MAPLE VALLEY | 185,597 | 20.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 185,597 | 20.0% |
Project Description
This project will complete the non-motorized facility gap section to include a 10 ft shared-used path on south side of SR 516 separated by a paved shoulder, curbs and gutter, and 5 ft buffer strip. The buffer strip will be used for stormwater bio-swales, adds ADA ramps, and adds signage.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Improves vehicle and pedestrian access;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |