The intersection of Court Street and Road 68 intersection experiences high volumes of vehicular traffic Court Street and Road 68 are classified as Principal Arterials with 9,044 ADT and 7,444 ADT, respectively. Both Court Street and Road 68 connect neighborhoods with commercial areas located east and north of the project location, respectively.
Projects — TIB Project Information
TIB Project Information
City of Pasco's Court Street Roundabout
8-4-174(021)-1
8-4-174(021)-1
Court Street Roundabout
Rd 68 Roundabout
FY 2025 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $1,415,000
County: Franklin | Legislative District: 8 | Project Length: 0.08 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
Lead Agency | PASCO |
Funding Year | 2025 |
Program | UAP |
Current Phase | Construction |
Legislative District | 8 |
Congressional District | 4 |
Federal Route Number | 3524 |
Project Length | 0.08 mi. |
ADT | 7,500 |
Functional Class | Principal |
Type of Work | Traffic Control |
Project Contact | Hollie Geiger |
Contact Email | geigerh@pasco-wa.gov |
TIB Engineer | Jonathan Heusman |
Last Payment Date | |
Cultural Resource Assessment | Section 106 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 01/01/2025 | |
DAHP Assessment Date | 02/15/2022 | |
Predesign Approval | ||
Design Approval | 01/01/2024 | 01/08/2024 |
Bid Auth. Approval | 03/01/2024 | 04/03/2024 |
Construction Approval | 04/30/2024 | 05/07/2024 |
Project Closeout | 12/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 216,982 | 617,000 |
Construction Contract | 1,383,018 | 2,333,731 |
Other Construction | 0 | 0 |
Total Construction | 1,600,000 | 2,950,731 |
Funding Surplus | - 185,000 | |
Total TIB Funding | 1,415,000 | 2,950,731 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
PASCO | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
STBG | 1,535,731 | 46.8% |
Total Local Funding | 1,535,731 | 46.8% |
Project Description
The project will construct a roundabout to appropriately serve current demand and planned mid to long-term needs. The proposed improvements will provide for adequate level of service at the intersection for the study horizon (LOS C by 2045). The project includes utility upgrades to avoid future disruption of proposed surface improvements and adequate lighting for motorized and non-motorized users. Hardscape was incorporated in this project, eliminating needs for permanent irrigation system.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |