The City of Warden has recently made significant improvements to the pedestrian facilities along Industrial Way and County Road and completed improvements this fall on a pathway/sidewalk on the eastern portion of 1st Street. However, a gap in safe, ADA-compliant facilities exists on W. 1st Street (SR 170) between Industrial Way and County Road. This section of road was identified in the Citys Heritage Trail Feasibility Study as a critical component of the Citys pedestrian network. This segment of W. 1st Street is used by many employees that live in Warden and walk to work in the industrial/commercial area of the City. Without safe facilities, pedestrians are forced to walk along the narrow unimproved shoulders without separation from the roadway which is a busy truck route.
Projects — TIB Project Information
TIB Project Information
City of Warden's W First Street (SR 170) Pathway
P-P-866(P02)-1
P-P-866(P02)-1
W First Street (SR 170) Pathway
S County Rd to Railroad R/W
FY 2024 Active Transportation Program
Current Phase : Design
Total TIB Funding : $57,375
County: Grant | Legislative District: 13 | Project Length: 1,400.00 | TIB Engineer: Jonathan Heusman | Last Payment Date: 02/21/2024
Project Information
Lead Agency | WARDEN |
Funding Year | 2024 |
Program | ATP |
Current Phase | Design |
Legislative District | 13 |
Congressional District | 4 |
Federal Route Number | 0170 |
Project Length | 1400.00 mi. |
ADT | 2,274 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Kristine Shuler |
Contact Email | kshuler@cityofwarden.org |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 02/21/2024 |
Cultural Resource Assessment | Section 106 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 01/06/2023 |
Bid Auth. Approval | 06/30/2025 | |
Construction Approval | 07/31/2025 | |
Project Closeout | 11/30/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 7,425 | 55,000 |
Right of Way | 0 | 0 |
Total Design | 7,425 | 55,000 |
Construction Engineering | 7,425 | 55,000 |
Construction Contract | 42,525 | 315,000 |
Other Construction | 0 | 0 |
Total Construction | 49,950 | 370,000 |
Total TIB Funding | 57,375 | 425,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WARDEN | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Grant County STBG | 367,625 | 86.5% |
Total Local Funding | 367,625 | 86.5% |
Project Description
The proposed project will construct an ADA-compliant pathway along W 1st Street (SR 170) from County Road to the Columbia Basin Railroad crossing, located between Weir Way and Jackson Ave.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Extends improvements;
- Improves vehicle and pedestrian access
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |