City of Medical Lake's Lefevre Street Restriping and Sidewalk

P-E-897(P10)-1

P-E-897(P10)-1
Lefevre Street Restriping and Sidewalk

Idaho St to n/o James St

FY 2024 Active Transportation Program
Current Phase : Construction
Total TIB Funding : $447,120

County: Spokane   |   Legislative District: 6   |   Project Length: 3,400.00   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 11/27/2024

Project Information

Lead Agency MEDICAL LAKE
Funding Year 2024
Program ATP
Current Phase Construction
Legislative District 6
Congressional District 5
Federal Route Number 0902
Project Length 3400.00 mi.
ADT 4,900
Functional Class Minor
Type of Work Pedestrian
Project Contact Scott Duncan
Contact Email sduncan@medical-lake.org
TIB Engineer Andrew Beagle
Last Payment Date 11/27/2024
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2025  
DAHP Assessment Date  
Predesign Approval
Design Approval 03/01/2023 02/23/2023
Bid Auth. Approval 07/30/2024 08/30/2024
Construction Approval 09/20/2024 09/18/2024
Project Closeout 12/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 45,632 49,600
Right of Way 0 0
Total Design 45,632 49,600
     
Construction Engineering 5,530 6,011
Construction Contract 337,998 428,330
Other Construction 0 0
Total Construction 343,528 434,341
     
Funding Increase 57,960  
Total TIB Funding 447,120 483,941

Local Funding Partners

Funding Amount Percent
MEDICAL LAKE 36,821 7.6%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 36,821 7.6%

Project Description

Restripe roadway for two 5' bike lanes, two 2' buffers, two 8' parking lanes, two 10' travel lanes, and a 10' center two way left turn lane. Reduce speed limit to 25 mph. New HMA needs South of Grace St. to Idaho St. to tie into the North Trail System.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments