Hatch Rd Phase 1 was funded by TIB in 2022 for 0.5 miles of improvements of this two-phase project. Hatch Rd Phase 2 (MP 1.10 - MP 1.63) will conclude construction to this road. Hatch Rd is the main route for a large residential area, elementary School, Bidwell Park and Aquatic Center, and links to US-395. The failing roadway has an ADT of 5,081, and an average PSC rating of 33. The west side of the road lacks sidewalks, bike lanes, and has noncompliant ADA curb ramps. Stormwater is not treated on the west side of the road.
Projects — TIB Project Information
TIB Project Information
Spokane County's Hatch Road Reconstruction Phase 2
8-3-032(076)-1
8-3-032(076)-1
Hatch Road Reconstruction Phase 2
MP 1.10 to MP 1.63
FY 2025 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $2,434,400
County: Spokane | Legislative District: 6 | Project Length: 0.50 | TIB Engineer: Andrew Beagle | Last Payment Date: 11/26/2024
Project Information
Lead Agency | SPOKANE COUNTY |
Funding Year | 2025 |
Program | UAP |
Current Phase | Design |
Legislative District | 6 |
Congressional District | 5 |
Federal Route Number | 3921 |
Project Length | 0.50 mi. |
ADT | 5,081 |
Functional Class | Collector |
Type of Work | Reconstruction |
Project Contact | Jami Hayes |
Contact Email | jhayes@spokanecounty.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | 11/26/2024 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2028 | |
DAHP Assessment Date | 06/12/2024 | |
Predesign Approval | ||
Design Approval | 01/01/2024 | 12/21/2023 |
Bid Auth. Approval | 11/01/2024 | |
Construction Approval | 01/01/2025 | |
Project Closeout | 12/01/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 254,442 | 318,000 |
Right of Way | 0 | 0 |
Total Design | 254,442 | 318,000 |
Construction Engineering | 254,442 | 318,000 |
Construction Contract | 1,925,516 | 2,407,000 |
Other Construction | 0 | 0 |
Total Construction | 2,179,958 | 2,725,000 |
Total TIB Funding | 2,434,400 | 3,043,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SPOKANE COUNTY | 608,600 | 20.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 608,600 | 20.0% |
Project Description
Reconstruct roadway, complete sidewalk improvements, install a 5ft bike lane, a 10ft swale to match Phase 1. Handy Rd and Ballard Rd crossings will be enchanced.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |