Puget Park Drive is a 25 mph urban major collector. The raised crosswalks at 67th Ave SE and at 72nd DR SE provide direct access to the large pedestrian generating park adjacent to Puget Park Drive. The curves in the road and vegetation limits the visibility and awareness of pedestrians.
Projects — TIB Project Information
TIB Project Information
Snohomish County's Puget Park Drive RRFBs
P-P-031(P03)-1
P-P-031(P03)-1
Puget Park Drive RRFBs
Various
FY 2025 Active Transportation Program
Current Phase : Design
Total TIB Funding : $195,914
County: Snohomish | Legislative District: 44 | Project Length: 112.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | SNOHOMISH COUNTY |
Funding Year | 2025 |
Program | ATP |
Current Phase | Design |
Legislative District | 44 |
Congressional District | 1 |
Federal Route Number | 2608 |
Project Length | 112.00 mi. |
ADT | 3,000 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Amber Ortega |
Contact Email | amber.ortega@snoco.org |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2024 | 12/13/2023 |
Bid Auth. Approval | 04/01/2025 | |
Construction Approval | 06/01/2025 | |
Project Closeout | 12/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 16,608 | 25,550 |
Right of Way | 0 | 0 |
Total Design | 16,608 | 25,550 |
Construction Engineering | 13,286 | 20,440 |
Construction Contract | 166,020 | 255,416 |
Other Construction | 0 | 0 |
Total Construction | 179,306 | 275,856 |
Total TIB Funding | 195,914 | 301,406 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SNOHOMISH COUNTY | 105,492 | 35.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 105,492 | 35.0% |
Project Description
This project will install RRFB and crosswalkimprovements will bring awareness to drivers of pedestrians crossing Puget Park Drive at 67th Ave SE and Sno Cascade Dr. Vegetation removal and installation of an RRFB at the two raised crosswalks will bring further visibility and awareness of pedestrians crossing.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Improves vehicle and pedestrian access;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |