City of Cheney's Elm Street Overlay
3-E-168(006)-1
3-E-168(006)-1
Elm Street Overlay
6th Street Vicinity to Washington Street
FY 2025 Arterial Preservation Program
Current Phase : Design
Total TIB Funding : $1,884,892
County: Spokane | Legislative District: 9 | Project Length: 0.51 | TIB Engineer: Andrew Beagle | Last Payment Date: 04/30/2024
Project Information
Lead Agency | CHENEY |
Funding Year | 2025 |
Program | APP |
Current Phase | Design |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 7700 |
Project Length | 0.51 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Todd Ableman |
Contact Email | tableman@cityofcheney.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | 04/30/2024 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 03/18/2024 | 02/26/2024 |
Bid Auth. Approval | 02/15/2025 | |
Construction Approval | 04/15/2025 | |
Project Closeout | 10/31/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 152,623 | 169,581 |
Right of Way | 0 | 0 |
Total Design | 152,623 | 169,581 |
Construction Engineering | 206,041 | 228,934 |
Construction Contract | 1,526,228 | 1,695,809 |
Other Construction | 0 | 0 |
Total Construction | 1,732,269 | 1,924,743 |
Total TIB Funding | 1,884,892 | 2,094,324 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CHENEY | 209,432 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 209,432 | 10.0% |
Project Description
Preservation work includes asphalt patch repairs, crack sealing, curb tapper grinding, asphalt overlay, ADA compliance sidewalk ramps within bulbouts, and street striping.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |