TIB Project Information

City of Wenatchee's Red Apple Road

8-3-160(033)-1

8-3-160(033)-1
Red Apple Road

Vista Pl to Miller St

FY 2024 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $1,919,228

County: Chelan   |   Legislative District: 12   |   Project Length: 0.35   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 07/11/2024

Project Information

Lead Agency WENATCHEE
Funding Year 2024
Program UAP
Current Phase Design
Legislative District 12
Congressional District 8
Federal Route Number 5806
Project Length 0.35 mi.
ADT 1,750
Functional Class Collector
Type of Work Reconstruction
Project Contact Charlotte Mitchell
Contact Email cmitchell@wenatcheewa.gov
TIB Engineer Andrew Beagle
Last Payment Date 07/11/2024
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2027  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2023 01/17/2023
Bid Auth. Approval 02/14/2025
Construction Approval 02/28/2025
Project Closeout 10/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 198,096 247,620
Right of Way 268,440 335,550
Total Design 466,536 583,170
     
Construction Engineering 132,064 165,080
Construction Contract 1,320,628 1,650,785
Other Construction 0 0
Total Construction 1,452,692 1,815,865
     
Total TIB Funding 1,919,228 2,399,035

Local Funding Partners

Funding Amount Percent
WENATCHEE 449,572 18.7%
WSDOT Funding 0 0.0%
Property Owner 1061 Red Apple Rd  17,345 0.7%
Property Owner 1205 Red Apple Rd  12,890 0.5%
 
 
 
 
 
 
Total Local Funding 479,807 17.5%

Project Description

Reconfigure street with parallel parking on both sides, conventional EB bike lane, raised and curb separated bike lane WB (potential transition to conventional after school), and sidewalk on both sides. A midblock crossing will be placed near multifamily housing access point, and the illumination system will be upgraded to provide adequate lighting levels throughout the corridor. The development under construction is constructing half street improvements as shown in the typical sections. HMA overlay of the existing roadway to tie the new widening and to preserve existing asset.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments