The First Street and Stafford Avenue intersection is one of the Cle Elums most essential and heavily traveled intersections. Second Street, also known as State Route 903 (SR 903), is the main access point for many of the surrounding communities. The Stafford Avenue corridor is also one of the main access points for residents living along Fifth Street, Sixth Street, and for the residents located to the north of Summitview Road. Second Street is the free flowing major movement with stop controlled minor movements on Stafford Avenue. High traffic volumes on Second Street cause excessive wait times for drivers and pedestrians alike. A recent traffic study at this intersection concluded a Level of Service (LOS) rating of F for the minor movements. This not only affects driver wait time and safety, but also impacts the ability for pedestrians to safely cross Second Street. An RRFB was installed last year, but still only serves as a warning of pedestrian presence.
Projects — TIB Project Information
TIB Project Information
City of Cle Elum's Second Street Roundabout
6-E-930(007)-1
6-E-930(007)-1
Second Street Roundabout
Second St (SR 903) and Stafford Ave
FY 2024 Small City Arterial Program
Current Phase : Design
Total TIB Funding : $704,591
County: Kittitas | Legislative District: 13 | Project Length: 0.05 | TIB Engineer: Jonathan Heusman | Last Payment Date: 08/12/2024
Project Information
Lead Agency | CLE ELUM |
Funding Year | 2024 |
Program | SCAP |
Current Phase | Design |
Legislative District | 13 |
Congressional District | 8 |
Federal Route Number | 0903 |
Project Length | 0.05 mi. |
ADT | 1,181 |
Functional Class | Collector |
Type of Work | Safety |
Project Contact | Rob Omans |
Contact Email | romans@cleelum.gov |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 08/12/2024 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 01/23/2023 |
Bid Auth. Approval | 12/31/2024 | |
Construction Approval | 01/31/2025 | |
Project Closeout | 10/15/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 80,750 | 85,000 |
Right of Way | 0 | 0 |
Total Design | 80,750 | 85,000 |
Construction Engineering | 80,750 | 85,000 |
Construction Contract | 471,841 | 496,675 |
Other Construction | 71,250 | 75,000 |
Total Construction | 623,841 | 656,675 |
Total TIB Funding | 704,591 | 741,675 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CLE ELUM | 37,084 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 37,084 | 5.0% |
Project Description
Construct a compact roundabout at the intersection of Second Street and Stafford Avenue as well as upgrade the sidewalks to meet ADA compliance.
Existing Condition
Project Benefits
- Improves safety;
- Improves mobility;
- Relieves congestion
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |