The majority of the Chelan's lake front commercial businesses are located between Downtown Chelan and the Lakeside Park on US97A generating high multimodal use and need. This section of US97A has minimal active transportation facilities and minimal parking for lake front commercial businesses.
Projects — TIB Project Information
TIB Project Information
City of Chelan's Lakeside Trail
P-E-848(P06)-1
P-E-848(P06)-1
Lakeside Trail
W Woodin Ave and W Webster Ave to N Water St and W Terrace Ave.
FY 2025 Active Transportation Program
Current Phase : Design
Total TIB Funding : $500,000
County: Chelan | Legislative District: 12 | Project Length: 6,238.00 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | CHELAN |
Funding Year | 2025 |
Program | ATP |
Current Phase | Design |
Legislative District | 12 |
Congressional District | 8 |
Federal Route Number | 0097A |
Project Length | 6238.00 mi. |
ADT | 7,100 |
Functional Class | Minor |
Type of Work | Pedestrian |
Project Contact | Travis Denham |
Contact Email | tdenham@cityofchelan.us |
TIB Engineer | Andrew Beagle |
Last Payment Date | |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 01/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2024 | 01/11/2024 |
Bid Auth. Approval | 12/20/2024 | |
Construction Approval | 03/01/2025 | |
Project Closeout | 11/01/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 111,042 | 800,038 |
Construction Contract | 388,958 | 2,802,376 |
Other Construction | 0 | 0 |
Total Construction | 500,000 | 3,602,414 |
Total TIB Funding | 500,000 | 3,602,414 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CHELAN | 100,483 | 2.8% |
WSDOT Funding | 0 | 0.0% |
WSDOT Ped and Bicycle Safety Program | 3,001,931 | 83.3% |
Total Local Funding | 3,102,414 | 86.1% |
Project Description
Multimodal trail connecting non-motorized users to the lakeside business located on US97A and the Central Business District. This project will also modify six existing transit stops.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |