 Projects — TIB Project Information

TIB Project Information

City of Vancouver's NE 137th Avenue

8-5-184(042)-1

8-5-184(042)-1
NE 137th Avenue

NE 49th St to NE Fourth Plain Blvd

FY 2024 Urban Arterial Program
Current Phase : Bid Authorization
Total TIB Funding : $3,250,000

County: Clark   |   Legislative District: 17   |   Project Length: 1.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency VANCOUVER
Funding Year 2024
Program UAP
Current Phase Bid Authorization
Legislative District 17
Congressional District 3
Federal Route Number 4421
Project Length 1.00 mi.
ADT 10,000
Functional Class Minor
Type of Work Major Widening
Project Contact Hassan Abdalla
Contact Email Hassan.Abdalla@cityofvancouver.us
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 01/01/2024  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2023 12/23/2022
Bid Auth. Approval 10/15/2023 09/25/2023
Construction Approval 03/30/2024
Project Closeout 12/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 316,913 1,591,000
Construction Contract 2,908,587 14,602,000
Other Construction 24,500 123,000
Total Construction 3,250,000 16,316,000
     
Total TIB Funding 3,250,000 16,316,000

Local Funding Partners

Funding Amount Percent
VANCOUVER 15,289,000 65.0%
WSDOT Funding 0 0.0%
STBG Funds DESIGN  1,100,000 4.7%
STBG Funds ROW  950,000 4.0%
STBG Funds CONST.  2,950,000 12.5%
 
 
 
 
 
Total Local Funding 20,289,000 86.2%

Project Description

This project will complete a full urban upgrade which will provide a safe urban corridor with full multi-modal functionality and provide the needed capacity for growth in the Birtcher development area. At the beginning of 2014 the City of Vancouver completed the urban upgrade project on NE 137th Avenue from NE 28th Street to NE 49th Street, leaving the section of roadway from 49th Street to Fourth Plain as the only remaining section requiring an urban upgrade along 136th / 137th Avenue to NE Fourth Plain Blvd. The project will include building one travel lane in each direction, a center turn lane/median, bike lanes, sidewalks with ADA ramps, roundabouts at identified intersections with multi-use paths, stormwater facilities, streetlights, as well as conduits and fiber installation.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments