NE 68th Street is a busy 2-lane collector serving a densely populated residential neighborhood with only a few small stretches of intermittent sidewalk and no bicycle lanes-ADT 3,288 vehicles, 35 MPH posted speed limit, with an 85th percentile speed of 43 MPH, and nearly 400 vehicles daily, traveling over 45 MPH. Road Geometry 10-11 foot lanes with no (or very narrow) shoulders, limited segments of sidewalk, slopes greater than 12 percent and open ditches, with locations where the roadway is 10 to 15 feet above or below the abutting parcels. Lack of a sidewalk forces pedestrians into the travel lanes, creating conflicts with vehicles which must swerve into oncoming lanes to avoid a collision. Pedestrians of all ages and abilities walk and bike along the corridor, both in the roadway and along worn pathways. There are transit routes at both ends of the road along both Highway 99 and St. Johns Road, and various pedestrian generators, including churches, a mosque, 20-acre park and farm.
Projects — TIB Project Information
TIB Project Information
Clark County's NE 68th Street Sidewalk
P-W-006(P10)-1
P-W-006(P10)-1
NE 68th Street Sidewalk
Highway 99 to NE St Johns Rd
FY 2023 Sidewalk Program
Current Phase : Construction
Total TIB Funding : $400,000
County: Clark | Legislative District: 49 | Project Length: 1.32 | TIB Engineer: Chris Langhoff | Last Payment Date: 05/02/2024
Project Information
Lead Agency | CLARK COUNTY |
Funding Year | 2023 |
Program | SP |
Current Phase | Construction |
Legislative District | 49 |
Congressional District | 3 |
Federal Route Number | 4206 |
Project Length | 1.32 mi. |
ADT | 3,288 |
Functional Class | Collector |
Type of Work | Pedestrian |
Project Contact | Chris Carle |
Contact Email | chris.carle@clark.wa.gov |
TIB Engineer | Chris Langhoff |
Last Payment Date | 05/02/2024 |
Cultural Resource Assessment | Section 106 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 01/01/2023 | |
DAHP Assessment Date | 10/10/2023 | |
Predesign Approval | ||
Design Approval | 03/01/2022 | 02/22/2022 |
Bid Auth. Approval | 04/15/2023 | 10/10/2023 |
Construction Approval | 12/30/2023 | 12/19/2023 |
Project Closeout | 12/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 33,777 | 804,689 |
Construction Contract | 366,223 | 4,835,348 |
Other Construction | 0 | 40,000 |
Total Construction | 400,000 | 5,680,037 |
Total TIB Funding | 400,000 | 5,680,037 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CLARK COUNTY | 23,037 | 0.4% |
WSDOT Funding | 0 | 0.0% |
City of Vancouver Partnership | 23,000 | 0.4% |
Federal Transportation Alternatives Program Grant | 3,387,000 | 59.6% |
Federal CMAQ Grant | 1,847,000 | 32.5% |
Traffic Impact Fees | 0 | 0.0% |
Total Local Funding | 5,280,037 | 92.9% |
Project Description
This project will Construct infill sidewalk, providing a continuous 1.34 miles of sidewalk along the south side of NE 68th Street, between Highway 99 and NE St. Johns Road Improve pedestrian safety and mobility, as pedestrians will no longer be forced to walk in the roadway and compete with vehicle traffic Add crosswalks to existing sidewalk and, destinations on the north side of the roadway, and add lighting and an RRFB at one crossing, reducing potential vehicle/pedestrian conflicts improves safety as well as travel times for all modes of transportation.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |