 Projects — TIB Project Information

TIB Project Information

City of Vancouver's SE 1st Street

8-5-184(040)-1

8-5-184(040)-1
SE 1st Street

SE 177th Ave to SE 192nd Ave

FY 2021 Urban Arterial Program
Current Phase : Construction
Total TIB Funding : $1,892,899

County: Clark   |   Legislative District: 18   |   Project Length: 0.71   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 10/11/2024

Project Information

Lead Agency VANCOUVER
Funding Year 2021
Program UAP
Current Phase Construction
Legislative District 18
Congressional District 3
Federal Route Number 4266
Project Length 0.71 mi.
ADT 12,000
Functional Class Principal
Type of Work Major Widening
Project Contact Anna Dearman
Contact Email anna.dearman@cityofvancouver.us
TIB Engineer Chris Langhoff
Last Payment Date 10/11/2024
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2019
Delayed Project Date 01/01/2021  
DAHP Assessment Date   11/03/2014
Predesign Approval
Design Approval 02/01/2020 12/12/2019
Bid Auth. Approval 01/01/2024 01/10/2024
Construction Approval 02/29/2024 03/08/2024
Project Closeout 12/31/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 200,000 1,410,000
Construction Contract 1,800,000 9,959,281
Other Construction 0 0
Total Construction 2,000,000 11,369,281
     
Funding Surplus - 107,101  
Total TIB Funding 1,892,899 11,369,281

Local Funding Partners

Funding Amount Percent
VANCOUVER 2,476,382 21.8%
WSDOT Funding 0 0.0%
USDOT  5,000,000 50.0%
Private developer  2,000,000 20.0%
 
 
 
 
 
 
Total Local Funding 9,476,382 91.8%

Project Description

This project will finish the eastern half of the SE 1st Street corridor between SE 177th Avenue and SE 192nd Avenue The western section between SE 164th Avenue and SE 177th Avenues is anticipated to be complete in June 2021. When completed, the project will connect to recently installed improvements east of SE 192nd Avenue. The design for this segment includes an access-restricted three-to-five-lane section for motor vehicles and separated, off-street protected facilities for people walking and biking. The project also includes lowering the roadway, installing a roundabout at SE 184th Avenue, and installing a new traffic signal at SE 190th Avenue. East of SE 190th Avenue, the roadway will be five motor vehicle lanes with bike lanes and detached sidewalks and additional lanes at the approach to SE 192nd Avenue. Today the roadway is two motor vehicle lanes with gravel shoulders in most areas, although there are spot frontage improvements where development has occurred. Hazardous roadside fixed objects are omnipresent off the gravel shoulder.

Project Pictures

Project Delays

Delay Type Resolution Date Comments
Schedule Issues
Level 1 Board Delay
09/25/2023

Project Payments