Highway 23 separates the high school and most of the residents on the west side of the highway from the convenience store that acts as a community hub and commercial area on the east side of the highway. The only access across the highway is over a marked crosswalk at 4th street, but there are no pedestrian ramps or sidewalks leading to this crosswalk. The sidewalk on the rest of 4th Street is intermittent, and what is there is narrow, in extremely poor condition, and is flush with the roadway. The lack of continuous sidewalk and ramps causes pedestrians to use the driving surface to make their way down 4th Street and across the highway.
Projects — TIB Project Information
TIB Project Information
City of Sprague's 4th Street Sidewalk
P-E-874(P04)-1
P-E-874(P04)-1
4th Street Sidewalk
SR 23 to E St
FY 2024 Active Transportation Program
Current Phase : Design
Total TIB Funding : $490,900
County: Lincoln | Legislative District: 13 | Project Length: 1,350.00 | TIB Engineer: Andrew Beagle | Last Payment Date: 11/25/2024
Project Information
Lead Agency | SPRAGUE |
Funding Year | 2024 |
Program | ATP |
Current Phase | Design |
Legislative District | 13 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 1350.00 mi. |
ADT | 850 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Lexi Behrens |
Contact Email | cityhall@sprague-wa.us |
TIB Engineer | Andrew Beagle |
Last Payment Date | 11/25/2024 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 01/03/2023 |
Bid Auth. Approval | 03/15/2024 | |
Construction Approval | 04/20/2024 | |
Project Closeout | 10/31/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 55,800 | 55,800 |
Right of Way | 0 | 0 |
Total Design | 55,800 | 55,800 |
Construction Engineering | 46,600 | 46,600 |
Construction Contract | 388,500 | 388,500 |
Other Construction | 0 | 0 |
Total Construction | 435,100 | 435,100 |
Total TIB Funding | 490,900 | 490,900 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SPRAGUE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Replace, widen to 5-feet, and infill sidewalk on 4th from Highway 23 to E Street. Construct traffic curb and upgrading ADA ramps along segment. RRFB and crossing with an advanced warning beacon on Highway 23.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap;
- Replaces failing bridge/culvert;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |