Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/21/2023 Payment 0.00 0.00 13,500.34 0.00 0.00 0.00 0.00 13,500.34
2 01/29/2024 Payment 0.00 0.00 19,512.28 0.00 0.00 0.00 0.00 19,512.28
3 03/05/2024 Payment 0.00 0.00 1,044.07 0.00 0.00 0.00 0.00 1,044.07
TOTAL PAYMENTS 0.00 0.00 34,056.69 0.00 0.00 0.00 0.00 34,056.69