Town of Colton's 2024 Chip Seal

2-E-908(005)-1

2-E-908(005)-1
2024 Chip Seal

Multiple Locations

FY 2025 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $252,037

County: Whitman   |   Legislative District: 9   |   Project Length: 2.19   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency COLTON
Funding Year 2025
Program SCPP
Current Phase Design
Legislative District 9
Congressional District 5
Federal Route Number 9999
Project Length 2.19 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Steve Bremer
Contact Email coltonshop@hotmail.com
TIB Engineer Jonathan Heusman
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2026  
DAHP Assessment Date  
Predesign Approval
Design Approval 05/01/2024 12/07/2023
Bid Auth. Approval 06/01/2025
Construction Approval 06/01/2025
Project Closeout 08/01/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 252,037 252,037
Other Construction 0 0
Total Construction 252,037 252,037
     
Total TIB Funding 252,037 252,037

Local Funding Partners

Funding Amount Percent
COLTON 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Chip seal, sweeping and prepping, traffic control, mobilization, and chip cleanup.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.