Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of College Place's SW Mojonnier Road Improvements

8-4-177(011)-1

8-4-177(011)-1
SW Mojonnier Road Improvements

College Ave to Bluvue Ln

FY 2025 Urban Arterial Program
Current Phase : Design
Total TIB Funding : $1,922,008

County: Walla Walla   |   Legislative District: 16   |   Project Length: 0.64   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency COLLEGE PLACE
Funding Year 2025
Program UAP
Current Phase Design
Legislative District 16
Congressional District 5
Federal Route Number 7152
Project Length 0.64 mi.
ADT 2,488
Functional Class Minor
Type of Work Major Widening
Project Contact Mike Rizzitiello
Contact Email mrizzitiello@cpwa.us
TIB Engineer Jonathan Heusman
Last Payment Date
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2028  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2024 12/19/2023
Bid Auth. Approval 10/01/2024
Construction Approval 11/01/2024
Project Closeout 11/03/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 451,840
Right of Way 0 260,000
Total Design 0 711,840
     
Construction Engineering 550,951 612,168
Construction Contract 1,371,057 5,448,000
Other Construction 0 0
Total Construction 1,922,008 6,060,168
     
Total TIB Funding 1,922,008 6,772,008

Local Funding Partners

Funding Amount Percent
COLLEGE PLACE 3,490,000 51.5%
WSDOT Funding 0 0.0%
STPUS  1,360,000 20.1%
 
 
 
 
 
 
 
Total Local Funding 4,850,000 71.6%

Project Description

This project will reconstruct the narrow rural roadway to current urban standards by providing sidewalks with ADA ramps for pedestrians, and bike lanes. The bike lanes will be channelized with a 2' buffer from adjacent traffic. Speed limit will be changed to 30 mph. This is a developing urbanized area of the city and water, and sewer expansion will be provided from other funds. The design and right-of-way phases are funded through a Surface Transportation Block Grant (STBG) and local funds. The TIB UAP grant will cover the construction phase funding needed to complete the project.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments