City of Arlington
67th Avenue NE/E Maple Street
204th St to Olympic Ave
The City of Arlington's 67th Avenue NE/E Maple Street project was selected for funding in November 2011. TIB contributed $6,061,270 in funding toward the $8,036,724 total cost of the project.
This project will reconstruct and widen 67th Avenue to provide two travel lanes, a two-way left turn lane, a 6-foot sidewalk on the west side and a 12-foot multi-use path on the east side of the roadway. A new traffic signal will be installed at the 211th Street intersection along with right turn pockets.
More Project Information
- View Detailed Project Information
- View the Project Map
- TIB Engineer for this project: Greg Armstrong