2026 SCPP 2-E-904(003)-1 MARCUS 2025 Fog Seal 08/06/2025 12.9
2023 UAP 8-1-202(008)-1 SHORELINE 145th Street (SR 523) 08/14/2025 12.6
2024 UAP 8-5-184(042)-1 VANCOUVER NE 137th Avenue 11/06/2025 9.9
2025 SCAP 6-E-930(008)-1 CLE ELUM First Street - Phase 3 11/18/2025 9.5
2025 SCAP 6-E-987(008)-1 OMAK Central Ave Reconstruction Phase II 12/08/2025 8.8
2025 ATP P-E-886(P02)-1 TWISP North End SR 20 PedestrianBike Path 01/30/2026 7.1
2024 UAP 8-1-205(006)-1 MAPLE VALLEY Maple Valley Highway (SR 169) 02/01/2026 7.0
2023 UAP 8-1-102(038)-1 RENTON Rainier Avenue S/N 02/05/2026 6.9
2025 ATP P-E-878(P06)-1 COULEE DAM ADA Ramp Upgrades 03/24/2026 5.3
2024 UAP 8-1-202(009)-1 SHORELINE N 145th Street (SR 523) Phase 1 04/28/2026 4.2
2023 UAP 8-2-153(003)-1 PORT ORCHARD Bethel Avenue 05/06/2026 3.9
2025 UAP 8-3-032(076)-1 SPOKANE COUNTY Hatch Road Reconstruction Phase 2 05/27/2026 3.2
2026 UAP 8-1-199(019)-1 LAKEWOOD Nyanza Road SW 06/09/2026 2.8
2025 ATP P-W-830(P02)-1 BAINBRIDGE ISLAND NE Wyatt Way 07/13/2026 1.7
2025 SCAP 6-W-838(009)-1 EVERSON S Harkness Street 07/13/2026 1.7
2026 SCAP 6-E-935(010)-1 GOLDENDALE Darland Drive Reconstruction 07/14/2026 1.6
2024 UAP 8-1-128(097)-1 TACOMA Sheridan Avenue Phase 1 07/17/2026 1.5
2026 APP 3-E-172(006)-1 WEST RICHLAND Keene Road Overlay 07/20/2026 1.4
2025 UAP 8-3-893(007)-1 AIRWAY HEIGHTS 6th Avenue 07/22/2026 1.4
2026 UAP 8-4-176(029)-1 WALLA WALLA Myra Road South Extension 07/24/2026 1.3
2025 ATP P-P-205(P01)-1 MAPLE VALLEY SE Kent Kangley Road (SR 516) Sidewalk 07/28/2026 1.2
2024 UAP 8-1-125(005)-1 BURIEN SW 148th Street 08/11/2026 0.7
2027 APP 3-E-167(006)-1 PULLMAN Bishop Blvd Resurfacing 08/11/2026 0.7
2024 UAP 8-2-158(010)-1 POULSBO Noll Road Phase 3B 08/13/2026 0.7
2027 SCPP 2-E-851(009)-1 BRIDGEPORT 2026 Chip Seal 08/14/2026 0.6
2023 SP P-P-199(P10)-1 LAKEWOOD Steilacoom Boulevard SW Sidewalk 08/14/2026 0.6
2026 ATP P-P-199(P12)-1 LAKEWOOD Interlaaken Drive Sidewalk 08/14/2026 0.6
2027 SCPP 2-E-843(004)-1 LIND 2026 Maintenance 08/14/2026 0.6