2025 ATP P-W-186(P05)-1 WASHOUGAL Evergreen Way Sidewalk 04/02/2025 12.3
2023 UAP 8-4-180(025)-1 YAKIMA N 1st Street 06/03/2025 10.2
2026 SCPP 2-E-904(003)-1 MARCUS 2025 Fog Seal 08/06/2025 8.1
2023 UAP 8-1-202(008)-1 SHORELINE 145th Street (SR 523) 08/14/2025 7.9
2025 ATP P-E-848(P07)-1 CHELAN Resin Bonded Stone Surfacing Pilot 10/03/2025 6.2
2024 SCAP 6-W-958(001)-1 OAKVILLE School Street and W Pine Street 10/14/2025 5.9
2024 SCAP 6-E-930(007)-1 CLE ELUM Second Street Roundabout 10/16/2025 5.8
2024 UAP 8-5-184(042)-1 VANCOUVER NE 137th Avenue 11/06/2025 5.1
2025 SCAP 6-E-930(008)-1 CLE ELUM First Street - Phase 3 11/18/2025 4.7
2023 UAP 8-2-126(013)-1 SEDRO WOOLLEY Township Street (SR 9) 12/01/2025 4.3
2025 SCAP 6-E-987(008)-1 OMAK Central Ave Reconstruction Phase II 12/08/2025 4.0
2023 UAP 8-2-153(003)-1 PORT ORCHARD Bethel Avenue 12/11/2025 3.9
2026 APP 3-P-112(009)-1 NORMANDY PARK Marine View Drive OverlayTh 12/16/2025 3.8
2025 SCPP 2-E-924(010)-1 DAYTON 2024 Otta Seal 01/08/2026 3.0
2023 SP P-P-199(P10)-1 LAKEWOOD Steilacoom Boulevard SW Sidewalk 01/26/2026 2.4
2025 ATP P-E-886(P02)-1 TWISP North End SR 20 PedestrianBike Path 01/30/2026 2.3
2024 UAP 8-1-205(006)-1 MAPLE VALLEY Maple Valley Highway (SR 169) 02/01/2026 2.2
2021 UAP 8-1-204(005)-1 COVINGTON Lakepointe Boulevard 02/03/2026 2.2
2023 UAP 8-1-102(038)-1 RENTON Rainier Avenue S/N 02/05/2026 2.1
2024 UAP 8-1-125(005)-1 BURIEN SW 148th Street 02/11/2026 1.9
2025 UAP 8-1-105(039)-1 AUBURN Regional Growth Center Improvements 02/17/2026 1.7
2024 UAP 8-5-034(017)-1 THURSTON COUNTY Marvin Road SE 02/25/2026 1.4
2026 APP 3-W-157(002)-1 OAK HARBOR SW Swantown Ave Overlay 03/04/2026 1.2
2026 ATP P-P-199(P12)-1 LAKEWOOD Interlaaken Drive Sidewalk 03/06/2026 1.2
2025 ATP P-E-878(P06)-1 COULEE DAM ADA Ramp Upgrades 03/24/2026 0.6
2026 APP 3-W-193(007)-1 CHEHALIS NW Louisiana Ave Overlay 03/31/2026 0.3
2025 UAP 8-1-106(035)-1 KENT 76th Avenue S South Phase 03/31/2026 0.3
2026 APP 3-E-162(001)-1 MOSES LAKE 2025 Chip Seal 03/31/2026 0.3