2021 UAP 8-1-141(008)-1 MOUNTLAKE TERRACE 66th Avenue W 08/05/2024 9.4
2019 UAP 8-5-196(018)-1 TUMWATER Capitol Boulevard South, Trosper Road SE 08/05/2024 9.4
2021 UAP 8-5-187(017)-1 LONGVIEW 46th Avenue 09/12/2024 8.2
2022 UAP 8-3-165(091)-2 SPOKANE Thor / Freya Couplet 09/30/2024 7.6
2023 UAP 8-5-950(002)-1 RIDGEFIELD S Royle Road 11/04/2024 6.4
2024 SCAP 6-E-865(007)-1 SOAP LAKE Main Avenue W 11/04/2024 6.4
2024 SCAP 6-E-882(011)-1 OROVILLE Ironwood Street 11/05/2024 6.4
2025 SCPP 2-E-850(006)-1 LEAVENWORTH 2024 Street Maintenance 11/18/2024 6.0
2021 UAP 8-4-174(020)-1 PASCO Lewis Street 11/19/2024 6.0
2022 SCAP 6-E-942(004)-1 MABTON Main Street Reconstruction Project 12/05/2024 5.4
2022 UAP 8-3-893(006)-1 AIRWAY HEIGHTS 10th Avenue Extension 12/16/2024 5.1
2025 SCPP 2-E-897(008)-1 MEDICAL LAKE 2024 Scrub and Chip Seal - Red Town 12/30/2024 4.6
2025 SCPP 2-E-928(005)-1 MESA 2024 Chip Seal 12/31/2024 4.6
2025 SCPP 2-E-946(004)-1 WAPATO 2024 Otta Seal 01/08/2025 4.3
2023 UAP 8-3-160(032)-1 WENATCHEE McKittrick Street 01/22/2025 3.8
2025 APP 3-E-179(004)-1 SUNNYSIDE Yakima Valley Highway Overlay 01/24/2025 3.8
2025 APP 3-W-186(002)-1 WASHOUGAL 2024 Main Street Overlay 01/28/2025 3.7
2024 SCPP 2-E-850(005)-1 LEAVENWORTH 2024 Scrub Seal - Red Town InitiativeIncre 01/30/2025 3.6
2020 UAP 8-2-152(027)-1 BREMERTON E 11th Street and Perry Avenue 02/28/2025 2.6
2023 UAP 8-2-153(003)-1 PORT ORCHARD Bethel Avenue 03/05/2025 2.5
2025 SCAP 6-E-845(009)-1 RITZVILLE 1st Avenue Improvements 03/11/2025 2.3
2025 ATP P-W-186(P05)-1 WASHOUGAL Evergreen Way Sidewalk 04/02/2025 1.5
2023 UAP 8-1-202(008)-1 SHORELINE 145th Street (SR 523) 04/08/2025 1.3
2019 UAP 8-2-159(015)-1 BURLINGTON East-West Connector 04/23/2025 0.9
2023 SP P-P-111(P07)-1 KIRKLAND 132nd Avenue NE 04/23/2025 0.9
2024 UAP 8-1-031(017)-1 SNOHOMISH COUNTY Larch Way Roundabout 04/29/2025 0.7
2021 UAP 8-1-132(004)-1 MILTON Pacific Highway S (SR 99) 05/08/2025 0.4
2025 APP 3-W-954(004)-1 WOODLAND 2024 S Pekin Overlay 05/09/2025 0.3
2024 UAP 8-3-032(075)-1 SPOKANE COUNTY Hatch Road Phase 1 05/13/2025 0.2