There is no roadway from Thayer Drive to Wellsian Way. There is currently a tee intersection at Wellsian Way and Wellhouse Loop.
TIB Project Information
City of Richland's Duportail Extension
8-4-171(018)-2
8-4-171(018)-2
Duportail Extension
Robert Ave to Wellsian Way
FY 2015 Urban Arterial Program
Current Phase : Audit
Total TIB Funding : $1,886,662
County: Benton | Legislative District: 8 | Project Length: 0.72 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/01/2018
Project Information
Lead Agency | RICHLAND |
Funding Year | 2015 |
Program | UAP |
Current Phase | Audit |
Legislative District | 8 |
Congressional District | 4 |
Federal Route Number | 3440 |
Project Length | 0.72 mi. |
ADT | 0 |
Functional Class | Minor |
Type of Work | New Location |
Project Contact | Jeff Peters |
Contact Email | jpeters@ci.richland.wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 11/01/2018 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2013 | |
Delayed Project Date | 07/01/2018 | |
DAHP Assessment Date | 09/19/2013 | |
Predesign Approval | ||
Design Approval | 01/01/2014 | 02/25/2014 |
Bid Auth. Approval | 05/01/2016 | 04/21/2016 |
Construction Approval | 05/01/2016 | 05/13/2016 |
Project Closeout | 06/30/2018 | 10/29/2018 |
Audit Date | 11/01/2018 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 119,625 | 151,850 |
Right of Way | 622,050 | 253,988 |
Total Design | 741,675 | 405,838 |
Construction Engineering | 57,420 | 103,316 |
Construction Contract | 1,433,735 | 1,360,795 |
Other Construction | 0 | 159,892 |
Total Construction | 1,491,155 | 1,624,003 |
Funding Increase | 67,220 | |
Funding Surplus | - 413,388 | |
Total TIB Funding | 1,886,662 | 2,029,841 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
RICHLAND | 143,179 | 7.1% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 143,179 | 7.1% |
Project Description
The project reconfigures the Thayer Drive/Duportail Street intersection with a single-lane roundabout. Duportail Street will extend from Thayer Drive to Wellhouse Loop to provide two travel lanes, a two-way center left turn lane, bike lanes and sidewalk on both sides of the street. A new signal will also be constructed at the intersection of Duportail Street and Wellsian Way.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |