Current Phase : Audit
Total TIB Funding : $1,886,662
County: Benton | Legislative District: 8 | Project Length: 0.72 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/01/2018
Project Information
| Lead Agency | RICHLAND | 
| Funding Year | 2015 | 
| Program | UAP | 
| Current Phase | Audit | 
| Legislative District | 8 | 
| Congressional District | 4 | 
| Federal Route Number | 3440 | 
| Project Length | 0.72 mi. | 
| ADT | 0 | 
| Functional Class | Minor | 
| Type of Work | New Location | 
| Project Contact | Jeff Peters | 
| Contact Email | jpeters@ci.richland.wa.us | 
| TIB Engineer | Jonathan Heusman | 
| Last Payment Date | 11/01/2018 | 
| Cultural Resource Assessment | CRA | 
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/22/2013 | |
| Delayed Project Date | 07/01/2018 | |
| DAHP Assessment Date | 09/19/2013 | |
| Predesign Approval | ||
| Design Approval | 01/01/2014 | 02/25/2014 | 
| Bid Auth. Approval | 05/01/2016 | 04/21/2016 | 
| Construction Approval | 05/01/2016 | 05/13/2016 | 
| Project Closeout | 06/30/2018 | 10/29/2018 | 
| Audit Date | 11/01/2018 | |
| Withdrawn Date | 
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 | 
| Design Study | 0 | 0 | 
| Total Predesign | 0 | 0 | 
| Special Study | 0 | 0 | 
| Design | 119,625 | 151,850 | 
| Right of Way | 622,050 | 253,988 | 
| Total Design | 741,675 | 405,838 | 
| Construction Engineering | 57,420 | 103,316 | 
| Construction Contract | 1,433,735 | 1,360,795 | 
| Other Construction | 0 | 159,892 | 
| Total Construction | 1,491,155 | 1,624,003 | 
| Funding Increase | 67,220 | |
| Funding Surplus | - 413,388 | |
| Total TIB Funding | 1,886,662 | 2,029,841 | 
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| RICHLAND | 143,179 | 7.1% | 
| WSDOT Funding | 0 | 0.0% | 
| Total Local Funding | 143,179 | 7.1% | 
Project Description
The project reconfigures the Thayer Drive/Duportail Street intersection with a single-lane roundabout. Duportail Street will extend from Thayer Drive to Wellhouse Loop to provide two travel lanes, a two-way center left turn lane, bike lanes and sidewalk on both sides of the street. A new signal will also be constructed at the intersection of Duportail Street and Wellsian Way.
Existing Condition
Project Benefits
Project Delays
| Delay Type | Resolution Date | Comments | 
|---|---|---|
No delayed project history.  | 
                                                    ||