TIB Project Information

City of Maple Valley's Witte Road SE

8-1-205(003)-1

8-1-205(003)-1
Witte Road SE

SR 169 to SE 240th Street

FY 2016 Urban Arterial Program
Current Phase : Audit
Total TIB Funding : $1,152,521

County: King   |   Legislative District: 5   |   Project Length: 0.28   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 04/01/2016

Project Information

Lead Agency MAPLE VALLEY
Funding Year 2016
Program UAP
Current Phase Audit
Legislative District 5
Congressional District 8
Federal Route Number 1381
Project Length 0.28 mi.
ADT 16,500
Functional Class Collector
Type of Work
Project Contact Laura Philpot
Contact Email Laura.philpot@maplevalleywa.gov
TIB Engineer Greg Armstrong
Last Payment Date 04/01/2016
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2014
Delayed Project Date 07/01/2019  
DAHP Assessment Date   07/07/2014
Predesign Approval
Design Approval 01/01/2015 12/05/2014
Bid Auth. Approval 01/15/2015 12/22/2014
Construction Approval 02/17/2015 02/18/2015
Project Closeout 03/31/2016 03/30/2016
Audit Date   04/01/2016
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 201,586 374,698
Construction Contract 1,478,302 1,669,362
Other Construction 0 0
Total Construction 1,679,888 2,044,060
     
Funding Surplus - 527,367  
Total TIB Funding 1,152,521 2,044,060

Local Funding Partners

Funding Amount Percent
MAPLE VALLEY 509,509 24.9%
WSDOT Funding 0 0.0%
Puget Sound Energy  382,030 18.2%
 
 
 
 
 
 
 
Total Local Funding 891,539 43.1%

Project Description

This project constructs two travel lanes, a two-way left-turn lane, bike lane, planter strip, curb, gutter and sidewalk along the west side of Witte Road between SE 240th Street and SR 169. In addition, the project installs LED streetlights and adds an enhanced LID stormwater system.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments