Witte Road is a busy two-lane arterial with an average daily traffic of 16,500 vehicles. The pavement is in poor condition and there are no pedestrian or bicycle facilities and no streetlights. The slope along the west side is failing due to erosion from a stormwater outfall and the 1960's storm drainage system is failing.
TIB Project Information
City of Maple Valley's Witte Road SE
8-1-205(003)-1
8-1-205(003)-1
Witte Road SE
SR 169 to SE 240th Street
FY 2016 Urban Arterial Program
Current Phase : Audit
Total TIB Funding : $1,152,521
County: King | Legislative District: 5 | Project Length: 0.28 | TIB Engineer: Greg Armstrong | Last Payment Date: 04/01/2016
Project Information
Lead Agency | MAPLE VALLEY |
Funding Year | 2016 |
Program | UAP |
Current Phase | Audit |
Legislative District | 5 |
Congressional District | 8 |
Federal Route Number | 1381 |
Project Length | 0.28 mi. |
ADT | 16,500 |
Functional Class | Collector |
Type of Work | |
Project Contact | Laura Philpot |
Contact Email | Laura.philpot@maplevalleywa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | 04/01/2016 |
Cultural Resource Assessment | Section 106 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/21/2014 | |
Delayed Project Date | 07/01/2019 | |
DAHP Assessment Date | 07/07/2014 | |
Predesign Approval | ||
Design Approval | 01/01/2015 | 12/05/2014 |
Bid Auth. Approval | 01/15/2015 | 12/22/2014 |
Construction Approval | 02/17/2015 | 02/18/2015 |
Project Closeout | 03/31/2016 | 03/30/2016 |
Audit Date | 04/01/2016 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 201,586 | 374,698 |
Construction Contract | 1,478,302 | 1,669,362 |
Other Construction | 0 | 0 |
Total Construction | 1,679,888 | 2,044,060 |
Funding Surplus | - 527,367 | |
Total TIB Funding | 1,152,521 | 2,044,060 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MAPLE VALLEY | 509,509 | 24.9% |
WSDOT Funding | 0 | 0.0% |
Puget Sound Energy | 382,030 | 18.2% |
Total Local Funding | 891,539 | 43.1% |
Project Description
This project constructs two travel lanes, a two-way left-turn lane, bike lane, planter strip, curb, gutter and sidewalk along the west side of Witte Road between SE 240th Street and SR 169. In addition, the project installs LED streetlights and adds an enhanced LID stormwater system.
Existing Condition
Project Benefits
- Improves safety;
- Completes gap;
- Restores structural condition
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |