Port of Tacoma Road is a heavily used truck traffic route that currently has asphalt in poor condition. The sidewalks are intermittent throughout the project limits, and the curb and gutter placed on both sides of the street are damaged in many areas. There is a temporary signal near Lincoln Avenue that was placed to alleviate truck congestion by supplying a queuing area.
TIB Project Information
City of Tacoma's Port of Tacoma Road
8-1-128(093)-1
8-1-128(093)-1
Port of Tacoma Road
E 11th Street to Marshall Avenue
FY 2016 Urban Arterial Program
Current Phase : Audit
Total TIB Funding : $6,689,494
County: Pierce | Legislative District: 27 | Project Length: 0.66 | TIB Engineer: Greg Armstrong | Last Payment Date: 01/17/2017
Project Information
Lead Agency | TACOMA |
Funding Year | 2016 |
Program | UAP |
Current Phase | Audit |
Legislative District | 27 |
Congressional District | 9 |
Federal Route Number | 3143 |
Project Length | 0.66 mi. |
ADT | 11,106 |
Functional Class | Principal |
Type of Work | |
Project Contact | Tom Rutherford |
Contact Email | trutherford@cityoftacoma.org |
TIB Engineer | Greg Armstrong |
Last Payment Date | 01/17/2017 |
Cultural Resource Assessment | Section 106 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/21/2014 | |
Delayed Project Date | 07/01/2019 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 01/01/2015 | 12/16/2014 |
Bid Auth. Approval | 01/15/2015 | 01/15/2015 |
Construction Approval | 04/01/2015 | 03/31/2015 |
Project Closeout | 08/31/2016 | 12/29/2016 |
Audit Date | 01/17/2017 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 774,900 | 651,450 |
Construction Contract | 5,165,800 | 9,657,416 |
Other Construction | 0 | 49,081 |
Total Construction | 5,940,700 | 10,357,947 |
Funding Increase | 748,794 | |
Total TIB Funding | 6,689,494 | 10,357,947 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
TACOMA | 1,583,973 | 15.3% |
WSDOT Funding | 0 | 0.0% |
Port of Tacoma | 944,890 | 9.1% |
Tacoma Rail | 139,590 | 1.3% |
FMSIB | 1,000,000 | 10.8% |
Total Local Funding | 3,668,453 | 0.0% |
Project Description
This project will replace the failing asphalt with a ten-inch cement concrete pavement surface from curb to curb. ADA ramps and driveways will be upgraded as needed, curb and gutter will be replaced as needed. The temporary signal near Lincoln Avenue will be replaced with a permanent signal, and the railroad will partner with the city to replace the railroad crossing and tracks.
Existing Condition
Project Benefits
- Improves safety;
- Improves mobility;
- Relieves congestion;
- Restores structural condition
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |