NE 85th Street is a very busy five-lane principal arterial with minimal transit and pedestrian facilities. Due to heavy congestion the two-way left turn lane functions poorly.
TIB Project Information
City of Kirkland's NE 85th Street (Construction Only)
8-1-111(018)-1
8-1-111(018)-1
NE 85th Street (Construction Only)
120th Ave NE to 132nd Ave NE
FY 2015 Urban Arterial Program
Current Phase : Audit
Total TIB Funding : $1,667,500
County: King | Legislative District: 48 | Project Length: 0.79 | TIB Engineer: Greg Armstrong | Last Payment Date: 08/15/2016
Project Information
Lead Agency | KIRKLAND |
Funding Year | 2015 |
Program | UAP |
Current Phase | Audit |
Legislative District | 48 |
Congressional District | 1 |
Federal Route Number | 2082 |
Project Length | 0.79 mi. |
ADT | 37,457 |
Functional Class | Principal |
Type of Work | Reconstruction |
Project Contact | Dave Snider |
Contact Email | dsnider@kirklandwa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | 08/15/2016 |
Cultural Resource Assessment | CRA |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2013 | |
Delayed Project Date | 07/01/2018 | |
DAHP Assessment Date | 03/05/2014 | |
Predesign Approval | ||
Design Approval | 01/01/2014 | 01/13/2014 |
Bid Auth. Approval | 04/04/2014 | 04/03/2014 |
Construction Approval | 05/08/2014 | 05/15/2014 |
Project Closeout | 08/05/2016 | 08/03/2016 |
Audit Date | 08/15/2016 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 11,476 | 53,500 |
Construction Contract | 1,438,524 | 6,725,520 |
Other Construction | 0 | 0 |
Total Construction | 1,450,000 | 6,779,020 |
Funding Increase | 217,500 | |
Total TIB Funding | 1,667,500 | 6,779,020 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
KIRKLAND | 3,368,847 | 49.7% |
WSDOT Funding | 0 | 0.0% |
Impact Fees | 351,805 | 5.9% |
Sound Transit | 1,390,868 | 38.6% |
Total Local Funding | 5,111,520 | 94.2% |
Project Description
This project reconstructs NE 85th Street with four travel lanes, a center median, curb, gutter, a landscaped strip and seven-foot sidewalks. In addition, right turn lanes at key intersection traffic signals will be upgraded and connected to Kirkland's traffic management center.
Existing Condition
Project Benefits
- Improves safety;
- Restores structural condition;
- Relieves congestion;
- Removes ADA barriers;
- Increases access control
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |