Commercial Street is a very narrow, deteriorated facility that parallels SR 2 west of the central business district. No sidewalk, illumination or drainage facilities exist.
TIB Project Information
City of Leavenworth's Commercial Street
6-E-850(010)-1
6-E-850(010)-1
Commercial Street
3rd St to 8th St
FY 2015 Small City Arterial Program
Current Phase : Audit
Total TIB Funding : $607,662
County: Chelan | Legislative District: 12 | Project Length: 0.31 | TIB Engineer: Andrew Beagle | Last Payment Date: 08/10/2017
Project Information
| Lead Agency | LEAVENWORTH |
| Funding Year | 2015 |
| Program | SCAP |
| Current Phase | Audit |
| Legislative District | 12 |
| Congressional District | 8 |
| Federal Route Number | 04LD |
| Project Length | 0.31 mi. |
| ADT | 800 |
| Functional Class | Collector |
| Type of Work | Reconstruction |
| Project Contact | Joel Walinski |
| Contact Email | cityadministrator@cityofleavenworth.com |
| TIB Engineer | Andrew Beagle |
| Last Payment Date | 08/10/2017 |
| Cultural Resource Assessment | Section 106 |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 11/22/2013 | |
| Delayed Project Date | 07/01/2016 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 01/01/2014 | 02/05/2014 |
| Bid Auth. Approval | 02/01/2015 | 02/26/2015 |
| Construction Approval | 03/23/2015 | 03/31/2015 |
| Project Closeout | 02/01/2017 | 08/03/2017 |
| Audit Date | 08/10/2017 | |
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 49,167 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 49,167 |
| Construction Engineering | 88,795 | 142,201 |
| Construction Contract | 592,830 | 1,112,614 |
| Other Construction | 0 | 18,930 |
| Total Construction | 681,625 | 1,273,745 |
| Funding Increase | 22,401 | |
| Funding Surplus | - 96,364 | |
| Total TIB Funding | 607,662 | 1,322,912 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| LEAVENWORTH | 97,207 | 7.3% |
| WSDOT Funding | 0 | 0.0% |
| STP Funding | 618,043 | 46.7% |
| Total Local Funding | 715,250 | 54.0% |
Project Description
The project reconstructs the roadway to provide two travel lanes and sidewalk on one side. A retaining wall will be built to allow for the wider section. The project also includes an illumination system and drainage improvements.
Existing Condition
Project Benefits
- Provides alternate emergency vehicle route;
- Completes gap in sidewalk system;
- Improves connectivity for vehicles and pedestrians
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||