City of Kalama's S 10th Street and Date Street Sidewalk

P-W-953(P09)-1

P-W-953(P09)-1
S 10th Street and Date Street Sidewalk

Cedar St to 330ft North and Date St from 8th St to 9th St

FY 2024 Active Transportation Program
Current Phase : Audit
Total TIB Funding : $219,645

County: Cowlitz   |   Legislative District: 20   |   Project Length: 530.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 11/15/2023

Project Information

Lead Agency KALAMA
Funding Year 2024
Program ATP
Current Phase Audit
Legislative District 20
Congressional District 3
Federal Route Number 9999
Project Length 530.00 mi.
ADT 375
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Kelly Rasmussen
Contact Email krasmussen@kalama.com
TIB Engineer Chris Langhoff
Last Payment Date 11/15/2023
Cultural Resource Assessment CRA & BER

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2025  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2023 12/19/2022
Bid Auth. Approval 03/15/2024 03/27/2023
Construction Approval 04/15/2023 05/03/2023
Project Closeout 11/30/2023 11/13/2023
Audit Date   11/15/2023
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 35,910 26,885
Right of Way 0 0
Total Design 35,910 26,885
     
Construction Engineering 35,910 39,097
Construction Contract 239,580 185,932
Other Construction 0 0
Total Construction 275,490 225,029
     
Funding Surplus - 91,755  
Total TIB Funding 219,645 251,914

Local Funding Partners

Funding Amount Percent
KALAMA 32,269 12.8%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 32,269 12.8%

Project Description

Extending the sidewalk on South 10th Street from approximately 60 feet south of Date Street to Cedar Street where it will connect with a new sidewalk to be installed in 2023. Sidewalk is also proposed to to be installed on Date Street from the existing terminus at 8th Street to the existing section of sidewalk at 9th street. This would complete the sidewalk network between 8th Street to 10th Street to Cedar Street back to 8th street.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.