The pedestrian access routes in the vicinity of Kalama Elementary are currently incomplete with segments of sidewalk missing at several locations.
Projects — TIB Project Information
TIB Project Information
City of Kalama's S 10th Street and Date Street Sidewalk
P-W-953(P09)-1
P-W-953(P09)-1
S 10th Street and Date Street Sidewalk
Cedar St to 330ft North and Date St from 8th St to 9th St
FY 2024 Active Transportation Program
Current Phase : Audit
Total TIB Funding : $219,645
County: Cowlitz | Legislative District: 20 | Project Length: 530.00 | TIB Engineer: Chris Langhoff | Last Payment Date: 11/15/2023
Project Information
Lead Agency | KALAMA |
Funding Year | 2024 |
Program | ATP |
Current Phase | Audit |
Legislative District | 20 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 530.00 mi. |
ADT | 375 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Kelly Rasmussen |
Contact Email | krasmussen@kalama.com |
TIB Engineer | Chris Langhoff |
Last Payment Date | 11/15/2023 |
Cultural Resource Assessment | CRA & BER |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 12/19/2022 |
Bid Auth. Approval | 03/15/2024 | 03/27/2023 |
Construction Approval | 04/15/2023 | 05/03/2023 |
Project Closeout | 11/30/2023 | 11/13/2023 |
Audit Date | 11/15/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 35,910 | 26,885 |
Right of Way | 0 | 0 |
Total Design | 35,910 | 26,885 |
Construction Engineering | 35,910 | 39,097 |
Construction Contract | 239,580 | 185,932 |
Other Construction | 0 | 0 |
Total Construction | 275,490 | 225,029 |
Funding Surplus | - 91,755 | |
Total TIB Funding | 219,645 | 251,914 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
KALAMA | 32,269 | 12.8% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 32,269 | 12.8% |
Project Description
Extending the sidewalk on South 10th Street from approximately 60 feet south of Date Street to Cedar Street where it will connect with a new sidewalk to be installed in 2023. Sidewalk is also proposed to to be installed on Date Street from the existing terminus at 8th Street to the existing section of sidewalk at 9th street. This would complete the sidewalk network between 8th Street to 10th Street to Cedar Street back to 8th street.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Completes gap
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |