Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/24/2023 Payment 0.00 0.00 24,150.29 0.00 0.00 0.00 0.00 24,150.29
2 08/09/2023 Payment 0.00 0.00 -926.59 0.00 30,369.91 0.00 94,741.35 124,184.67
3 09/11/2023 Payment 0.00 0.00 0.00 0.00 3,447.04 0.00 47,659.95 51,106.99
4 11/15/2023 Audit 0.00 0.00 217.47 0.00 271.92 0.00 19,713.66 20,203.05
TOTAL PAYMENTS 0.00 0.00 23,441.17 0.00 34,088.87 0.00 162,114.96 219,645.00