City of Arlington's Complete Streets Award
C-P-817(001)-1
C-P-817(001)-1
Complete Streets Award
March 2019 Selection
FY 2020 Complete Streets Program
Current Phase : Audit
Total TIB Funding : $605,000
County: Snohomish | Legislative District: 39 | Project Length: 0.10 | TIB Engineer: Greg Armstrong | Last Payment Date: 02/26/2020
Project Information
| Lead Agency | ARLINGTON |
| Funding Year | 2020 |
| Program | CSP |
| Current Phase | Audit |
| Legislative District | 39 |
| Congressional District | 2 |
| Federal Route Number | 9999 |
| Project Length | 0.10 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Pedestrian |
| Project Contact | Nova Heaton |
| Contact Email | nheaton@arlingtonwa.gov |
| TIB Engineer | Greg Armstrong |
| Last Payment Date | 02/26/2020 |
| Cultural Resource Assessment |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 03/22/2019 | |
| Delayed Project Date | 07/01/2021 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 05/01/2019 | |
| Bid Auth. Approval | 05/01/2019 | |
| Construction Approval | 05/01/2019 | 04/23/2019 |
| Project Closeout | 03/15/2022 | 03/17/2022 |
| Audit Date | 03/17/2022 | |
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 605,000 | 605,000 |
| Other Construction | 0 | 0 |
| Total Construction | 605,000 | 605,000 |
| Total TIB Funding | 605,000 | 605,000 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| ARLINGTON | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Complete Streets Workplan
| Item | Type of Work | Date Added | Est. Cost | Actual Cost | Complete |
|---|---|---|---|---|---|
| 188th Street Sidewalk | Pedestrian | Mar 2019 | $130,000 | $130,000 | |
| Install 600 lf of curb,gutter and sidewalk along the south side of 188th Street NE adjacent to two city parks and sports fields. Including a planter strip, low impact drainage improvements and street trees | |||||
| 59th Ave NE Sidewalk | Pedestrian | Mar 2019 | $262,000 | $262,000 | |
| Install 750 lf of curb, gutter and sidewalk along the east side of 59th Ave NE adjacent to Bill Quake Park and sports fields. Including a planer strip, low impact drainage improvements and street trees. | |||||
| Public Art Installation and Decorative Bike Rack | Bicycle; Aesthetics | Mar 2019 | $12,000 | $12,000 | |
| Commission and install public art at the corner of 59th Ave and 188th Street to celebrate the youth sports activity in the area. Install decorative bike racks at city parks. | |||||
| Mid-Block Crossing on 188th St NE | Pedestrian | Mar 2019 | $18,000 | $18,000 | |
| Install a Rectangular Rapid Flashing Beacon, crosswalk, and ADA ramps between parking areas for three adjacent parks and a proposed future transit stop. | |||||
| Mid-Block Crossing on 59th Ave NE | Pedestrian | Mar 2019 | $18,000 | $18,000 | |
| Install a Rectangular Rapid Flashing Beacon, crosswalk, and ADA ramps to connect existing Airport Trail to Boys and Girl Club, parks and sports fields. | |||||
| Evans Park Sidewalk | Pedestrian | Mar 2019 | $160,000 | $160,000 | |
| Install 450 lf of shoulder, curb, gutter and sidewalk along the east side of 59th Ave NE adjacent to Evans Park | |||||
| Complete Streets Leadership Academy | Feb 2020 | $5,000 | $5,000 | ||
| Training and demostration project | |||||
Project Pictures
No images available.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||