Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/08/2019 Payment 0.00 0.00 0.00 0.00 0.00 0.00 600,000.00 600,000.00
2 02/26/2020 Payment 0.00 0.00 0.00 0.00 0.00 0.00 5,000.00 5,000.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 605,000.00 605,000.00