City of Montesano's W. Pioneer Avenue

6-W-957(I13)-1

6-W-957(I13)-1
W. Pioneer Avenue

Main to 4th

FY 2024 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $155,610

County: Grays Harbor   |   Legislative District: 19   |   Project Length: 0.19   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 12/27/2023

Project Information

Lead Agency MONTESANO
Funding Year 2024
Program SCAP
Current Phase Construction
Legislative District 19
Congressional District 6
Federal Route Number 5189
Project Length 0.19 mi.
ADT 2,000
Functional Class Collector
Type of Work Reconstruction
Project Contact Mike Olden
Contact Email molden@montesano.us
TIB Engineer Chris Langhoff
Last Payment Date 12/27/2023
Cultural Resource Assessment Section 106

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 07/01/2025  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2023 01/09/2023
Bid Auth. Approval 12/15/2023 12/19/2023
Construction Approval 02/29/2024 03/29/2024
Project Closeout 09/01/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 150,000
Right of Way 13,500 25,000
Total Design 13,500 175,000
     
Construction Engineering 0 203,000
Construction Contract 175,500 1,290,625
Other Construction 0 0
Total Construction 175,500 1,493,625
     
Funding Surplus - 33,390  
Total TIB Funding 155,610 1,668,625

Local Funding Partners

Funding Amount Percent
MONTESANO 137,865 8.3%
WSDOT Funding 0 0.0%
FHWA  1,375,150 82.4%
 
 
 
 
 
 
 
Total Local Funding 1,513,015 90.7%

Project Description

The solution is to replace the sidewalks and approaches and replace pavement at intersections with full depth reconstruction. Pavement outside of the intersections will be ground to 1 inch depth with an HMA overlay with of 2 inches. Catch basins wil be upgraded at intersections.