Pioneer Avenue is the most utilized arterial in the City and a vital link for commercial traffic. The street serves the downtown business corridor. The pavement is aging and becoming deteriorated. The City is beginning to spend more time and resources on patching this section of roadway. A majority of the curb ramps and sidewalks in this corridor do not meet ADA requirements. The Storm drain inlets are the older style that are a hazard to bicycles. This project will provide an opportunity for continuation of systematic improvements to the entire Pioneer Avenue Corridor.
Projects — TIB Project Information
TIB Project Information
City of Montesano's W. Pioneer Avenue
6-W-957(I13)-1
6-W-957(I13)-1
W. Pioneer Avenue
Main to 4th
FY 2024 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $155,610
County: Grays Harbor | Legislative District: 19 | Project Length: 0.19 | TIB Engineer: Chris Langhoff | Last Payment Date: 06/18/2024
Project Information
Lead Agency | MONTESANO |
Funding Year | 2024 |
Program | SCAP |
Current Phase | Construction |
Legislative District | 19 |
Congressional District | 6 |
Federal Route Number | 5189 |
Project Length | 0.19 mi. |
ADT | 2,000 |
Functional Class | Collector |
Type of Work | Reconstruction |
Project Contact | Mike Olden |
Contact Email | molden@montesano.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | 06/18/2024 |
Cultural Resource Assessment | Section 106 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | 12/19/2023 | |
Predesign Approval | ||
Design Approval | 02/01/2023 | 01/09/2023 |
Bid Auth. Approval | 12/15/2023 | 12/19/2023 |
Construction Approval | 02/29/2024 | 03/29/2024 |
Project Closeout | 11/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 150,000 |
Right of Way | 13,500 | 25,000 |
Total Design | 13,500 | 175,000 |
Construction Engineering | 0 | 203,000 |
Construction Contract | 175,500 | 1,290,625 |
Other Construction | 0 | 0 |
Total Construction | 175,500 | 1,493,625 |
Funding Surplus | - 33,390 | |
Total TIB Funding | 155,610 | 1,668,625 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MONTESANO | 137,865 | 8.3% |
WSDOT Funding | 0 | 0.0% |
FHWA | 1,375,150 | 82.4% |
Total Local Funding | 1,513,015 | 90.7% |
Project Description
The solution is to replace the sidewalks and approaches and replace pavement at intersections with full depth reconstruction. Pavement outside of the intersections will be ground to 1 inch depth with an HMA overlay with of 2 inches. Catch basins wil be upgraded at intersections.
Existing Condition
Project Benefits
- Extends improvements;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |