Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 06/27/2023 Payment 0.00 0.00 1,971.55 291.32 0.00 0.00 0.00 2,262.87
2 09/27/2023 Payment 0.00 0.00 1,763.01 705.51 0.00 0.00 0.00 2,468.52
3 12/27/2023 Payment 0.00 0.00 554.28 440.05 0.00 0.00 0.00 994.33
TOTAL PAYMENTS 0.00 0.00 4,288.84 1,436.88 0.00 0.00 0.00 5,725.72