City of Pullman's Bishop Boulevard Overlay
3-E-167(003)-1
3-E-167(003)-1
Bishop Boulevard Overlay
Fairmount Dr to w/o SR 270
FY 2024 Arterial Preservation Program
Current Phase : Audit
Total TIB Funding : $619,867
County: Whitman | Legislative District: 9 | Project Length: 0.98 | TIB Engineer: Jonathan Heusman | Last Payment Date: 12/14/2023
Project Information
Lead Agency | PULLMAN |
Funding Year | 2024 |
Program | APP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 7422 |
Project Length | 0.98 mi. |
ADT | 0 |
Functional Class | Minor |
Type of Work | Resurfacing |
Project Contact | Cara Haley |
Contact Email | cara.haley@pullman-wa.gov |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 12/14/2023 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 12/22/2022 |
Bid Auth. Approval | 04/30/2023 | 04/14/2023 |
Construction Approval | 05/31/2023 | 05/10/2023 |
Project Closeout | 11/30/2023 | 12/05/2023 |
Audit Date | 12/14/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 9,327 | 21,226 |
Right of Way | 0 | 0 |
Total Design | 9,327 | 21,226 |
Construction Engineering | 15,545 | 42,302 |
Construction Contract | 529,459 | 745,772 |
Other Construction | 0 | 0 |
Total Construction | 545,004 | 788,074 |
Funding Increase | 83,150 | |
Funding Surplus | - 17,614 | |
Total TIB Funding | 619,867 | 809,300 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
PULLMAN | 189,433 | 23.4% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 189,433 | 23.4% |
Project Description
Grind/haul 2 in. HMA. Main travel lanes only, typ not TWLTL. 30 ft typ mill width, 45 ft wide at far north end. Skip two bridges and their approaches (done in 2018). Surface prep, spot repair, overlay w/2 in. HMA, restripe, and other incidental work for the following segment Bishop Boulevard - Fairmount Dr to w/o SR 270
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |