Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/22/2023 Payment 0.00 0.00 9,196.76 0.00 0.00 0.00 0.00 9,196.76
2 08/28/2023 Payment 0.00 0.00 0.00 0.00 21,922.28 0.00 498,435.18 520,357.46
3 12/14/2023 Audit 0.00 0.00 7,060.87 0.00 10,478.09 0.00 72,773.82 90,312.78
TOTAL PAYMENTS 0.00 0.00 16,257.63 0.00 32,400.37 0.00 571,209.00 619,867.00