Town of Reardan's 2021 Overlay

2-E-873(006)-1

2-E-873(006)-1
2021 Overlay

Multiple Locations

FY 2023 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $364,819

County: Lincoln   |   Legislative District: 13   |   Project Length: 0.12   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 10/02/2023

Project Information

Lead Agency REARDAN
Funding Year 2023
Program SCPP
Current Phase Audit
Legislative District 13
Congressional District 5
Federal Route Number 9999
Project Length 0.12 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Megan Kamstra
Contact Email clerk@townofreardan.com
TIB Engineer Andrew Beagle
Last Payment Date 10/02/2023
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/19/2021
Delayed Project Date 07/01/2024  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2022 12/07/2021
Bid Auth. Approval 03/15/2023 04/11/2023
Construction Approval 04/28/2023 05/12/2023
Project Closeout 09/30/2023 09/11/2023
Audit Date   10/02/2023
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 21,509 21,712
Right of Way 0 0
Total Design 21,509 21,712
     
Construction Engineering 26,886 24,263
Construction Contract 247,351 318,844
Other Construction 0 0
Total Construction 274,237 343,107
     
Funding Increase 69,073  
Total TIB Funding 364,819 364,819

Local Funding Partners

Funding Amount Percent
REARDAN 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Project will patch potholes, crack seal, apply HMA pre-level and 1.5 HMA overlay, and shoulder rock. Water line is locate in west gravel shoulder and is not under road. 2 ADA ramps on Birch St are not compliant and will be replaced.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments