Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/25/2023 Payment 0.00 0.00 21,478.96 0.00 0.00 0.00 0.00 21,478.96
2 05/12/2023 Payment 0.00 0.00 233.00 0.00 0.00 0.00 0.00 233.00
3 07/24/2023 Payment 0.00 0.00 0.00 0.00 10,809.93 0.00 303,315.46 314,125.39
4 10/02/2023 Audit 0.00 0.00 0.04 0.00 13,453.07 0.00 15,528.54 28,981.65
TOTAL PAYMENTS 0.00 0.00 21,712.00 0.00 24,263.00 0.00 318,844.00 364,819.00