Projects — TIB Funding Cycles
FY 2026 UAP Selections
|
|
||||
Region: Puget Sound | Legislative District: 5 | Length: 0.58 mi. | FY 2026 Urban Arterial Program (UAP) |
![]() |
Existing ConditionsRoberts Drive is an important arterial for the City of Black Diamond. With the future roundabout, currently under construction at the intersection of Roberts and SR 169, the reconstruction of Roberts Drive will create better flow for traffic and pedestrians to move about the City. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 606,328 | 107,072 | 713,400 |
Right of Way | 0 | 0 | 0 |
Construction | 2,959,422 | 522,608 | 3,482,030 |
Project Totals | $3,565,750 | $629,680 | $4,195,430 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
Summary of Improvements
- Completes gap;
- Restores structural condition;
- Removes ADA barriers;
- Builds multimodal facilities
Description of Improvements
This project will crack and seat the existing roadway and widen to include facilities for both biyclesand pedestrians.